Assessment Year | 2003 |
---|---|
Principal Product | condiments and salad dressing |
NAICS | 311941: Mayonnaise, Dressing, and Other Prepared Sauce Manufacturing |
SIC | 2035: Pickled Fruits and Vegetables, Vegetable Sauces and Seasonings, and Salad Dressings |
Sales Range | $10 M to 50M |
# of Employees | 27 |
Plant Area |
15,000
ft2
|
Annual Production | 50,000,000
pieces
|
Production Hrs. Annual | 3,432
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $24,843 | 182,240 |
kWh
|
$0.14 |
Electricity Demand | $3,182 | 750 |
kW-mo/yr
|
$4.24 |
Natural Gas | $6,059 | 764 |
MMBtu
|
$7.93 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $13,172 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,659 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $787 | - |
$967
7,095
kWh
|
- | - | $(-180.0) | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $236 | - |
$213
1,564
kWh
|
$23
-
kW-mo/yr
|
- | - | |
03 | 2.4234: Cool compressor air intake with heat exchanger | $146 | $30 |
$123
900
kWh
|
$23
-
kW-mo/yr
|
- | - | |
04 | 2.2621: Modify refrigeration system to operate at a lower pressure | $8,291 | $4,495 |
$8,291
60,830
kWh
|
- | - | - | |
05 | 2.7135: Install occupancy sensors | $186 | $124 |
$168
1,235
kWh
|
$18
-
kW-mo/yr
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $346 | $318 |
$312
2,286
kWh
|
$34
-
kW-mo/yr
|
- | - | |
07 | 3.5218: Reuse / recycle/ sell rubber products | $1,800 | - | - | - |
$1,800
-
lb
|
- | |
08 | 3.5316: Contract a wood pallet recycling company | $1,380 | $260 | - | - |
$1,380
-
lb
|
- | |
TOTAL RECOMMENDED | $13,172 | $5,227 |
$10,074
73,910
kWh
|
$98
-
kW-mo/yr
|
$3,180
-
lb
|
$(-180.0) | ||
TOTAL IMPLEMENTED | $2,659 | $608 |
$1,402
10,281
kWh
|
$57
-
kW-mo/yr
|
$1,380
-
lb
|
$(-180.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs