ITAC Assessment: SF0274
ITAC logo
ITAC Assessment: SF0274
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product condiments and salad dressing
NAICS 311941: Mayonnaise, Dressing, and Other Prepared Sauce Manufacturing
SIC 2035: Pickled Fruits and Vegetables, Vegetable Sauces and Seasonings, and Salad Dressings
Sales Range $10
M
to 50
M
# of Employees 27
Plant Area 15,000
ft2
Annual Production 50,000,000
pieces
Production Hrs. Annual 3,432
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $24,843 182,240
kWh
Electricity Demand $3,182 750
kW-mo/yr
Natural Gas $6,059 764
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,172 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,659

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $787 - $967
7,095
kWh
- - $(-180.0)
02 2.4231: Reduce the pressure of compressed air to the minimum required $236 - $213
1,564
kWh
$23
-
kW-mo/yr
- -
03 2.4234: Cool compressor air intake with heat exchanger $146 $30 $123
900
kWh
$23
-
kW-mo/yr
- -
04 2.2621: Modify refrigeration system to operate at a lower pressure $8,291 $4,495 $8,291
60,830
kWh
- - -
05 2.7135: Install occupancy sensors $186 $124 $168
1,235
kWh
$18
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $346 $318 $312
2,286
kWh
$34
-
kW-mo/yr
- -
07 3.5218: Reuse / recycle/ sell rubber products $1,800 - - - $1,800
-
lb
-
08 3.5316: Contract a wood pallet recycling company $1,380 $260 - - $1,380
-
lb
-
TOTAL RECOMMENDED $13,172 $5,227 $10,074
73,910
kWh
$98
-
kW-mo/yr
$3,180
-
lb
$(-180.0)
TOTAL IMPLEMENTED $2,659 $608 $1,402
10,281
kWh
$57
-
kW-mo/yr
$1,380
-
lb
$(-180.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings