*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Dairy Product
NAICS 311511: Fluid Milk Manufacturing
SIC 2026: Fluid Milk
Sales Range $5
M
to 10
M
# of Employees 30
Plant Area
n/a
Annual Production 0
Tgal
Production Hrs. Annual 4,992
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $43,127 568,799
kWh
Electricity Demand $7,606 1,434
kW-mo/yr
LPG $48,309 4,129
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,342 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,288

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings
01 2.1231: Establish burner maintenance schedule for boilers $5,192 - - - - $5,192
-
MMBtu
02 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $635 - $602
7,938
kWh
$33
-
kW-mo/yr
- -
03 2.4226: Use / purchase optimum sized compressor $1,974 - $1,974
26,041
kWh
- - -
04 2.2511: Insulate bare equipment $5,516 $3,984 - - - $5,516
-
MMBtu
05 2.4133: Use most efficient type of electric motors $2,653 - $2,492
32,872
kWh
$161
-
kW-mo/yr
- -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,739 $3,905 $2,596
34,250
kWh
$143
-
kW-mo/yr
- -
07 2.4231: Reduce the pressure of compressed air to the minimum required $633 $1,743 - $33
-
kW-mo/yr
$600
-
MMBtu
-
TOTAL RECOMMENDED $19,342 $9,632 $7,664
101,101
kWh
$370
-
kW-mo/yr
$600
-
MMBtu
$10,708
-
MMBtu
TOTAL IMPLEMENTED $3,288 - $3,094
40,810
kWh
$194
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs