ITAC Assessment: SF0260
ITAC logo
ITAC Assessment: SF0260
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Radio Assembly
NAICS 334220: Radio and Television Broadcasting and Wireless Communications Equipment Manufacturing
SIC 3663: Radio and Television Broadcasting and Communications Equipment
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 42,000
ft2
Annual Production 0
units
Production Hrs. Annual 4,992
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $89,723 887,317
kWh
Electricity Demand $24,279 1,880
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,827 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
01 2.7111: Reduce illumination to minimum necessary levels $6,136 - n/a $4,694
46,426
kWh
$1,442
-
kW-mo/yr
-
02 2.4224: Upgrade controls on compressors $1,100 $188 n/a $1,100
10,885
kWh
- -
03 2.7135: Install occupancy sensors $376 $388 n/a $288
2,845
kWh
$88
-
kW-mo/yr
-
04 3.6193: Install equipment (eg compactor) to reduce disposal costs $3,415 $9,181 n/a - - $3,415
-
lb
05 3.5217: Reuse / recycle/ sell paper products $2,800 $9,550 n/a - - $2,800
-
lb
TOTAL RECOMMENDED $13,827 $19,307 $6,082
60,156
kWh
$1,530
-
kW-mo/yr
$6,215
-
lb
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs