ITAC Assessment: SF0256
ITAC logo
ITAC Assessment: SF0256
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Elastomeric Rubber Products
NAICS 326299: All Other Rubber Product Manufacturing
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 100
Plant Area 70,000
ft2
Annual Production 0
units
Production Hrs. Annual 2,860
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $126,192 1,439,362
kWh
Electricity Demand $45,804 11,017
kW-mo/yr
Natural Gas $136,551 23,069
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,337 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,773 $636 $2,930
33,417
kWh
$843
-
kW-mo/yr
- -
02 2.4133: Use most efficient type of electric motors $593 $433 $474
5,410
kWh
$119
-
kW-mo/yr
- -
03 2.1233: Analyze flue gas for proper air/fuel ratio $11,197 $8,880 - - $11,197
-
MMBtu
-
04 2.7135: Install occupancy sensors $2,150 $5,160 $1,739
19,834
kWh
$411
-
kW-mo/yr
- -
05 2.7132: Install timers on light switches in little used areas $11,466 $7,440 $9,002
102,680
kWh
$2,464
-
kW-mo/yr
- -
06 2.2437: Recover waste heat from equipment $382 $1,618 - - $382
-
MMBtu
-
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $801 $5,231 $629
7,177
kWh
$172
-
kW-mo/yr
- -
08 3.5218: Reuse / recycle/ sell rubber products $975 $1,800 - - - $975
-
lb
TOTAL RECOMMENDED $31,337 $31,198 $14,774
168,518
kWh
$4,009
-
kW-mo/yr
$11,579
-
MMBtu
$975
-
lb
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs