Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Interior Molding
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 15
Plant Area 57,000
ft2
Annual Production 5,000,000
lb
Production Hrs. Annual 4,800
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $199,531 2,202,000
kWh
Electricity Demand $104,337 9,528
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,789 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.4239: Eliminate or reduce compressed air usage $1,176 $134 $1,176
12,980
kWh
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,744 $1,542 $1,362
15,033
kWh
$382
-
kW-mo/yr
-
03 2.4133: Use most efficient type of electric motors $924 $587 $765
5,792
kWh
$159
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $678 $1,749 $463
5,110
kWh
$215
-
kW-mo/yr
-
05 2.7145: Install skylights $1,924 $12,971 $1,322
14,592
kWh
$602
-
kW-mo/yr
-
06 2.3212: Optimize plant power factor $7,343 $11,038 - - $7,343
TOTAL RECOMMENDED $13,789 $28,021 $5,088
53,507
kWh
$1,358
-
kW-mo/yr
$7,343
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs