ITAC Assessment: CO0669
ITAC logo
ITAC Assessment: CO0669
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Slip Sheets
NAICS 326130: Laminated Plastics Plate, Sheet (except Packaging), and Shape Manufacturing
SIC 3083: Laminated Plastics Plate, Sheet, and Profile Shapes
Sales Range $5
M
to 10
M
# of Employees 20
Plant Area 34,000
ft2
Annual Production 8,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $101,764 2,639,033
kWh
Electricity Demand $125,500 6,311
kW-mo/yr
Electricity Fees $1,180 -
Natural Gas $2,181 210
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,430 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,240

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4133: Use most efficient type of electric motors $6,590 $15,280 $3,440
86,000
kWh
$3,150
-
kW-mo/yr
02 2.2511: Insulate bare equipment $4,190 $4,840 $2,470
61,600
kWh
$1,720
-
kW-mo/yr
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,650 $390 $970
24,200
kWh
$680
-
kW-mo/yr
TOTAL RECOMMENDED $12,430 $20,510 $6,880
171,800
kWh
$5,550
-
kW-mo/yr
TOTAL IMPLEMENTED $8,240 $15,670 $4,410
110,200
kWh
$3,830
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs