| Assessment Year | 2003 |
|---|---|
| Principal Product | Corruged Boxes |
| NAICS |
n/a
|
| SIC | 2653: Corrugated and Solid Fiber Boxes |
| Sales Range | $10 M to 50M |
| # of Employees | 50 |
| Plant Area |
50,000
ft2
|
| Annual Production | 8,265,000
lb
|
| Production Hrs. Annual | 4,420
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $28,400 | 188,400 |
kWh
|
$0.15 |
| Natural Gas | $98,043 | 8,755 |
MMBtu
|
$11.20 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $13,668 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $1,269 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,269 | - | - |
$1,269
-
MMBtu
|
- | |
| 02 | 2.2121: Increase amount of condensate returned | $443 | $325 | - |
$443
-
MMBtu
|
- | |
| 03 | 2.4133: Use most efficient type of electric motors | $300 | $294 |
$300
1,525
kWh
|
- | - | |
| 04 | 2.7132: Install timers on light switches in little used areas | $1,291 | $1,460 |
$1,291
6,553
kWh
|
- | - | |
| 05 | 2.7134: Use photocell controls | $501 | $1,080 |
$501
3,401
kWh
|
- | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $870 | $2,355 |
$870
4,226
kWh
|
- | - | |
| 07 | 3.6192: Use a less expensive method of waste removal | $1,485 | - | - | - |
$1,485
-
lb
|
|
| 08 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $7,509 | - | - | - |
$7,509
-
lb
|
|
| TOTAL RECOMMENDED | $13,668 | $5,514 |
$2,962
15,705
kWh
|
$1,712
-
MMBtu
|
$8,994
-
lb
|
||
| TOTAL IMPLEMENTED | $1,269 | - | - |
$1,269
-
MMBtu
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs