Assessment Year 2003
Principal Product Corruged Boxes
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 50,000
ft2
Annual Production 8,265,000
lb
Production Hrs. Annual 4,420
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $28,400 188,400
kWh
Natural Gas $98,043 8,755
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,668 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,269

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,269 - - $1,269
-
MMBtu
-
02 2.2121: Increase amount of condensate returned $443 $325 - $443
-
MMBtu
-
03 2.4133: Use most efficient type of electric motors $300 $294 $300
1,525
kWh
- -
04 2.7132: Install timers on light switches in little used areas $1,291 $1,460 $1,291
6,553
kWh
- -
05 2.7134: Use photocell controls $501 $1,080 $501
3,401
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $870 $2,355 $870
4,226
kWh
- -
07 3.6192: Use a less expensive method of waste removal $1,485 - - - $1,485
-
lb
08 3.6193: Install equipment (eg compactor) to reduce disposal costs $7,509 - - - $7,509
-
lb
TOTAL RECOMMENDED $13,668 $5,514 $2,962
15,705
kWh
$1,712
-
MMBtu
$8,994
-
lb
TOTAL IMPLEMENTED $1,269 - - $1,269
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs