Assessment Year | 2003 |
---|---|
Principal Product | Corruged Boxes |
NAICS |
n/a
|
SIC | 2653: Corrugated and Solid Fiber Boxes |
Sales Range | $10 M to 50M |
# of Employees | 50 |
Plant Area |
50,000
ft2
|
Annual Production | 8,265,000
lb
|
Production Hrs. Annual | 4,420
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $28,400 | 188,400 |
kWh
|
$0.15 |
Natural Gas | $98,043 | 8,755 |
MMBtu
|
$11.20 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $13,668 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,269 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,269 | - | - |
$1,269
-
MMBtu
|
- | |
02 | 2.2121: Increase amount of condensate returned | $443 | $325 | - |
$443
-
MMBtu
|
- | |
03 | 2.4133: Use most efficient type of electric motors | $300 | $294 |
$300
1,525
kWh
|
- | - | |
04 | 2.7132: Install timers on light switches in little used areas | $1,291 | $1,460 |
$1,291
6,553
kWh
|
- | - | |
05 | 2.7134: Use photocell controls | $501 | $1,080 |
$501
3,401
kWh
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $870 | $2,355 |
$870
4,226
kWh
|
- | - | |
07 | 3.6192: Use a less expensive method of waste removal | $1,485 | - | - | - |
$1,485
-
lb
|
|
08 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $7,509 | - | - | - |
$7,509
-
lb
|
|
TOTAL RECOMMENDED | $13,668 | $5,514 |
$2,962
15,705
kWh
|
$1,712
-
MMBtu
|
$8,994
-
lb
|
||
TOTAL IMPLEMENTED | $1,269 | - | - |
$1,269
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs