| Assessment Year | 2001 |
|---|---|
| Principal Product | Sealants |
| NAICS |
n/a
|
| SIC | 2891: Adhesives and Sealants |
| Sales Range | $10 M to 50M |
| # of Employees | 17 |
| Plant Area |
49,755
ft2
|
| Annual Production | 9,000
Tgal
|
| Production Hrs. Annual | 2,080
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $110,571 | 928,460 |
kWh
|
$0.12 |
| Natural Gas | $8,612 | 679 |
MMBtu
|
$12.68 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $23,385 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $938 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
|---|---|---|---|---|---|---|---|
| 01 | 3.7392: Apply a protective coating to racks and tanks | $401 | - |
$401
5,072
kWh
|
- | - | |
| 02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $537 | $474 |
$537
3,569
kWh
|
- | - | |
| 03 | 2.5123: Reduce fluid flow rates | $2,233 | $3,211 |
$2,233
16,618
kWh
|
- | - | |
| 04 | 2.2121: Increase amount of condensate returned | $1,207 | $2,607 | - |
$1,207
-
MMBtu
|
- | |
| 05 | 2.7132: Install timers on light switches in little used areas | $1,420 | $3,720 |
$1,420
9,449
kWh
|
- | - | |
| 06 | 2.4133: Use most efficient type of electric motors | $689 | $1,783 |
$689
7,361
kWh
|
- | - | |
| 07 | 4.211: Consider use / purchase of bulk materials where possible | $8,785 | $25,000 | - | - |
$8,785
-
lb
|
|
| 08 | 3.6192: Use a less expensive method of waste removal | $8,113 | $24,200 | - | - |
$8,113
-
lb
|
|
| TOTAL RECOMMENDED | $23,385 | $60,995 |
$5,280
42,069
kWh
|
$1,207
-
MMBtu
|
$16,898
-
lb
|
||
| TOTAL IMPLEMENTED | $938 | $474 |
$938
8,641
kWh
|
- | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs