ITAC Assessment: SF0230
ITAC logo
ITAC Assessment: SF0230
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Sealants
NAICS
n/a
SIC 2891: Adhesives and Sealants
Sales Range $10
M
to 50
M
# of Employees 17
Plant Area 49,755
ft2
Annual Production 9,000
Tgal
Production Hrs. Annual 2,080
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $110,571 928,460
kWh
Natural Gas $8,612 679
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,385 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $938

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 3.7392: Apply a protective coating to racks and tanks $401 - $401
5,072
kWh
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $537 $474 $537
3,569
kWh
- -
03 2.5123: Reduce fluid flow rates $2,233 $3,211 $2,233
16,618
kWh
- -
04 2.2121: Increase amount of condensate returned $1,207 $2,607 - $1,207
-
MMBtu
-
05 2.7132: Install timers on light switches in little used areas $1,420 $3,720 $1,420
9,449
kWh
- -
06 2.4133: Use most efficient type of electric motors $689 $1,783 $689
7,361
kWh
- -
07 4.211: Consider use / purchase of bulk materials where possible $8,785 $25,000 - - $8,785
-
lb
08 3.6192: Use a less expensive method of waste removal $8,113 $24,200 - - $8,113
-
lb
TOTAL RECOMMENDED $23,385 $60,995 $5,280
42,069
kWh
$1,207
-
MMBtu
$16,898
-
lb
TOTAL IMPLEMENTED $938 $474 $938
8,641
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs