ITAC Assessment: SF0223
ITAC logo
ITAC Assessment: SF0223
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Lumber
NAICS
n/a
SIC 2421: Sawmills and Planing Mills, General
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area 5,220,000
ft2
Annual Production 45,700
thousand feet
Production Hrs. Annual 8,736
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $738,423 10,823,615
kWh
Natural Gas $595,458 216,816
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,005,239 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $477,130

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.6218: Turn off equipment when not in use $16,905 - $16,905
238,095
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,094 - $2,094
36,585
kWh
- -
03 2.6212: Turn off equipment during breaks, reduce operating time $29,535 $3,134 $29,535
415,990
kWh
- -
04 2.7132: Install timers on light switches in little used areas $4,914 $2,160 $4,914
69,204
kWh
- -
05 2.7135: Install occupancy sensors $1,304 $1,080 $1,304
14,205
kWh
- -
06 2.1121: Use insulation in furnaces to facilitate heating / cooling $885 $900 - $885
-
MMBtu
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,122 $3,134 $3,122
43,972
kWh
- -
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $7,501 $9,123 $7,501
105,641
kWh
- -
09 2.7135: Install occupancy sensors $343 $750 $343
4,830
kWh
- -
10 2.4133: Use most efficient type of electric motors $1,230 $2,999 $1,230
17,327
kWh
- -
11 2.4322: Use or replace with energy efficient substitutes $7,473,507 $413,000 - - $7,473,507
12 2.4322: Use or replace with energy efficient substitutes $450,000 $50,000 - - $450,000
13 2.3212: Optimize plant power factor $13,899 $20,315 - - $13,899
TOTAL RECOMMENDED $8,005,239 $506,595 $66,948
945,849
kWh
$885
-
MMBtu
$7,937,406
TOTAL IMPLEMENTED $477,130 $57,274 $26,245
365,476
kWh
$885
-
MMBtu
$450,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs