ITAC Assessment: SF0218
ITAC logo
ITAC Assessment: SF0218
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Metal Ingots
NAICS
n/a
SIC 3349:
Sales Range $10
M
to 50
M
# of Employees 30
Plant Area 47,500
ft2
Annual Production 1,500,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $315,916 2,622,620
kWh
Natural Gas $12,487 1,569
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,828 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,133

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Solid Waste (non-haz) Savings
01 2.6218: Turn off equipment when not in use $3,760 - $3,760
31,200
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,973 $360 $1,973
16,377
kWh
-
03 2.2611: Moderate cooling tower outlet temperature $1,846 $495 $1,846
15,320
kWh
-
04 2.4239: Eliminate or reduce compressed air usage $670 $420 $670
5,696
kWh
-
05 2.6218: Turn off equipment when not in use $2,703 $2,200 $2,703
23,920
kWh
-
06 2.7132: Install timers on light switches in little used areas $4,406 $4,080 $4,406
36,575
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $7,754 $11,785 $7,754
64,352
kWh
-
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,572 $6,779 $3,572
29,637
kWh
-
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $565 $2,735 $565
4,687
kWh
-
10 3.6193: Install equipment (eg compactor) to reduce disposal costs $2,579 $15,374 - $2,579
-
lb
TOTAL RECOMMENDED $29,828 $44,228 $27,249
227,764
kWh
$2,579
-
lb
TOTAL IMPLEMENTED $14,133 $16,225 $14,133
117,304
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs