ITAC Assessment: SF0217
ITAC logo
ITAC Assessment: SF0217
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Natural Cheese
NAICS
n/a
SIC 2022: Natural, Processed, and Imitation Cheese
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 60,000
ft2
Annual Production 27,000,000
lb
Production Hrs. Annual 6,292
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $436,739 6,048,000
kWh
Natural Gas $472,378 60,878
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,170 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,798

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,715 - $3,715
51,456
kWh
02 2.2135: Repair and eliminate steam leaks $611 - $611
34,529
kWh
03 2.4234: Cool compressor air intake with heat exchanger $2,551 $248 $2,551
36,198
kWh
04 2.4231: Reduce the pressure of compressed air to the minimum required $5,181 $3,150 $5,181
71,765
kWh
05 2.4133: Use most efficient type of electric motors $2,600 $1,761 $2,600
36,017
kWh
06 2.2511: Insulate bare equipment $730 $1,032 $730
27,550
kWh
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,141 $2,088 $1,141
15,798
kWh
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,410 $15,510 $7,410
102,629
kWh
09 2.7132: Install timers on light switches in little used areas $1,231 $4,000 $1,231
17,050
kWh
TOTAL RECOMMENDED $25,170 $27,789 $25,170
392,992
kWh
TOTAL IMPLEMENTED $22,798 $21,701 $22,798
360,144
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs