| Assessment Year | 2001 |
|---|---|
| Principal Product | Hot-Dip Galvanizing |
| NAICS |
n/a
|
| SIC | 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified |
| Sales Range | $5 M to 10M |
| # of Employees | 30 |
| Plant Area |
16,000
ft2
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 3,669
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $53,462 | 540,440 |
kWh
|
$0.099 |
| Natural Gas | $146,752 | 27,005 |
MMBtu
|
$5.43 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $141,702 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $1,910 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,492 | - |
$1,492
17,790
kWh
|
- | - | |
| 02 | 2.2511: Insulate bare equipment | $19,198 | $3,152 | - |
$19,198
-
MMBtu
|
- | |
| 03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $2,282 | $950 |
$2,282
23,115
kWh
|
- | - | |
| 04 | 2.7135: Install occupancy sensors | $106 | $120 |
$106
1,065
kWh
|
- | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $312 | $1,113 |
$312
3,164
kWh
|
- | - | |
| 06 | 2.2437: Recover waste heat from equipment | $13,159 | $55,000 | - |
$13,159
-
MMBtu
|
- | |
| 07 | 3.5311: Recover and reuse waste material | $105,153 | $107,153 | - | - |
$105,153
-
lb
|
|
| TOTAL RECOMMENDED | $141,702 | $167,488 |
$4,192
45,134
kWh
|
$32,357
-
MMBtu
|
$105,153
-
lb
|
||
| TOTAL IMPLEMENTED | $1,910 | $1,233 |
$1,910
22,019
kWh
|
- | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs