Assessment Year | 2001 |
---|---|
Principal Product | Injection Molded Plastic Parts |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 70 |
Plant Area |
25,000
ft2
|
Annual Production | 10,000,000
units
|
Production Hrs. Annual | 6,396
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $91,404 | 877,560 |
kWh
|
$0.10 |
Natural Gas | $5,297 | 712 |
MMBtu
|
$7.44 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $16,881 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,891 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7124: Make a practice of turning off lights when not needed | $348 | - |
$348
3,608
kWh
|
- | - | |
02 | 2.7135: Install occupancy sensors | $652 | $720 |
$652
6,277
kWh
|
- | - | |
03 | 2.2611: Moderate cooling tower outlet temperature | $395 | $495 |
$395
3,360
kWh
|
- | - | |
04 | 2.2511: Insulate bare equipment | $2,858 | $4,793 |
$2,858
53,547
kWh
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,032 | $5,880 |
$3,032
29,157
kWh
|
- | - | |
06 | 2.6218: Turn off equipment when not in use | $496 | $1,308 |
$496
4,770
kWh
|
- | - | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,435 | $13,442 |
$2,435
23,414
kWh
|
- | - | |
08 | 3.5311: Recover and reuse waste material | $576 | - | - |
$576
-
lb
|
- | |
09 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $5,189 | $19,300 | - |
$5,189
-
lb
|
- | |
10 | 2.8112: Combine utility meters | $900 | $1,900 | - | - | $900 | |
TOTAL RECOMMENDED | $16,881 | $47,838 |
$10,216
124,133
kWh
|
$5,765
-
lb
|
$900 | ||
TOTAL IMPLEMENTED | $1,891 | $2,523 |
$1,891
18,015
kWh
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs