ITAC Assessment: SF0207
ITAC logo
ITAC Assessment: SF0207
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Injection Molded Plastic Parts
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 70
Plant Area 25,000
ft2
Annual Production 10,000,000
units
Production Hrs. Annual 6,396
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $91,404 877,560
kWh
Natural Gas $5,297 712
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,881 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,891

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.7124: Make a practice of turning off lights when not needed $348 - $348
3,608
kWh
- -
02 2.7135: Install occupancy sensors $652 $720 $652
6,277
kWh
- -
03 2.2611: Moderate cooling tower outlet temperature $395 $495 $395
3,360
kWh
- -
04 2.2511: Insulate bare equipment $2,858 $4,793 $2,858
53,547
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $3,032 $5,880 $3,032
29,157
kWh
- -
06 2.6218: Turn off equipment when not in use $496 $1,308 $496
4,770
kWh
- -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,435 $13,442 $2,435
23,414
kWh
- -
08 3.5311: Recover and reuse waste material $576 - - $576
-
lb
-
09 3.6193: Install equipment (eg compactor) to reduce disposal costs $5,189 $19,300 - $5,189
-
lb
-
10 2.8112: Combine utility meters $900 $1,900 - - $900
TOTAL RECOMMENDED $16,881 $47,838 $10,216
124,133
kWh
$5,765
-
lb
$900
TOTAL IMPLEMENTED $1,891 $2,523 $1,891
18,015
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs