| Assessment Year | 2001 |
|---|---|
| Principal Product | Injection Molded Plastic Parts |
| NAICS |
n/a
|
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $5 M to 10M |
| # of Employees | 70 |
| Plant Area |
25,000
ft2
|
| Annual Production | 10,000,000
units
|
| Production Hrs. Annual | 6,396
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $91,404 | 877,560 |
kWh
|
$0.10 |
| Natural Gas | $5,297 | 712 |
MMBtu
|
$7.44 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $16,881 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $1,891 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7124: Make a practice of turning off lights when not needed | $348 | - |
$348
3,608
kWh
|
- | - | |
| 02 | 2.7135: Install occupancy sensors | $652 | $720 |
$652
6,277
kWh
|
- | - | |
| 03 | 2.2611: Moderate cooling tower outlet temperature | $395 | $495 |
$395
3,360
kWh
|
- | - | |
| 04 | 2.2511: Insulate bare equipment | $2,858 | $4,793 |
$2,858
53,547
kWh
|
- | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,032 | $5,880 |
$3,032
29,157
kWh
|
- | - | |
| 06 | 2.6218: Turn off equipment when not in use | $496 | $1,308 |
$496
4,770
kWh
|
- | - | |
| 07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,435 | $13,442 |
$2,435
23,414
kWh
|
- | - | |
| 08 | 3.5311: Recover and reuse waste material | $576 | - | - |
$576
-
lb
|
- | |
| 09 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $5,189 | $19,300 | - |
$5,189
-
lb
|
- | |
| 10 | 2.8112: Combine utility meters | $900 | $1,900 | - | - | $900 | |
| TOTAL RECOMMENDED | $16,881 | $47,838 |
$10,216
124,133
kWh
|
$5,765
-
lb
|
$900 | ||
| TOTAL IMPLEMENTED | $1,891 | $2,523 |
$1,891
18,015
kWh
|
- | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs