ITAC Assessment: SF0202
ITAC logo
ITAC Assessment: SF0202
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Drafting Paper
NAICS
n/a
SIC 2672: Coated and Laminated Paper, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 30
Plant Area 35,000
ft2
Annual Production 1,500,000
lb
Production Hrs. Annual 3,120
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $27,652 268,860
kWh
Natural Gas $19,072 2,760
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,697 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,241

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.6218: Turn off equipment when not in use $698 - $698
6,786
kWh
- -
02 2.7135: Install occupancy sensors $960 $600 $960
9,336
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,800 $11,610 $2,800
27,221
kWh
- -
04 2.7132: Install timers on light switches in little used areas $941 $5,000 $941
9,149
kWh
- -
05 4.623: Employ modular jigs to reduce process set-up time $5,583 $2,180 - $5,583
-
MMBtu
-
06 3.6193: Install equipment (eg compactor) to reduce disposal costs $11,715 $17,142 - - $11,715
-
lb
TOTAL RECOMMENDED $22,697 $36,532 $5,399
52,492
kWh
$5,583
-
MMBtu
$11,715
-
lb
TOTAL IMPLEMENTED $7,241 $2,780 $1,658
16,122
kWh
$5,583
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs