ITAC Assessment: SF0198
ITAC logo
ITAC Assessment: SF0198
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Automotive interior flooring
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 40,000
ft2
Annual Production 250,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $260,758 3,216,454
kWh
Natural Gas $3,804 529
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,810 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $30,810

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.7132: Install timers on light switches in little used areas $1,396 $4,740 $1,396
26,522
kWh
-
02 2.7135: Install occupancy sensors $307 $600 $307
5,841
kWh
-
03 2.7124: Make a practice of turning off lights when not needed $215 - $215
4,083
kWh
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $412 $1,992 $412
7,833
kWh
-
05 2.4133: Use most efficient type of electric motors $1,299 $4,199 $1,299
17,584
kWh
-
06 3.6193: Install equipment (eg compactor) to reduce disposal costs $1,800 $80 - $1,800
07 4.652: Replace existing equipment with more suitable substitutes $24,608 $3,400 - $24,608
08 4.632: Change operating conditions $773 - - $773
TOTAL RECOMMENDED $30,810 $15,011 $3,629
61,863
kWh
$27,181
TOTAL IMPLEMENTED $30,810 $15,011 $3,629
61,863
kWh
$27,181
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs