ITAC Assessment: SF0195
ITAC logo
ITAC Assessment: SF0195
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Partitions
NAICS
n/a
SIC 2675: Die-Cut Paper and Paperboard and Cardboard
Sales Range $10
M
to 50
M
# of Employees 71
Plant Area 75,000
ft2
Annual Production 70,000,000
pieces
Production Hrs. Annual 4,420
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $116,429 1,242,520
kWh
Natural Gas $10,733 1,654
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $166,796 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,721

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.2711: Utilize outside air instead of conditioned air for drying $5,651 $3,306 $5,651
55,696
kWh
- -
02 2.4133: Use most efficient type of electric motors $1,324 $1,467 $1,324
9,802
kWh
- -
03 2.7132: Install timers on light switches in little used areas $848 $1,200 $848
9,205
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,297 $5,880 $2,297
24,275
kWh
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,100 $3,250 $1,100
12,185
kWh
- -
06 3.5313: Increase amount of waste recovered for resale $124,556 $60,000 - $124,556
-
lb
-
07 3.6193: Install equipment (eg compactor) to reduce disposal costs $3,147 $10,300 - $3,147
-
lb
-
08 4.652: Replace existing equipment with more suitable substitutes $27,873 $2,000 - - $27,873
TOTAL RECOMMENDED $166,796 $87,403 $11,220
111,163
kWh
$127,703
-
lb
$27,873
TOTAL IMPLEMENTED $4,721 $10,597 $4,721
46,262
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs