ITAC Assessment: SF0194
ITAC logo
ITAC Assessment: SF0194
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Life Safety Explosives
NAICS
n/a
SIC 3769: Guided Missile Space Vehicle Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 310
Plant Area 180,000
ft2
Annual Production 0
units
Production Hrs. Annual 7,488
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $267,460 3,134,779
kWh
Electricity Demand $719 8,439
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $62,218 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,831

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Solid Waste (non-haz) Savings
01 2.2223: Enhance sensitivity of temperature control and cutoff $25,387 $11,668 $25,387
298,155
kWh
-
02 2.7132: Install timers on light switches in little used areas $5,898 $3,720 $5,898
69,270
kWh
-
03 2.2514: Cover open tanks $550 $746 $550
6,447
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $29,331 $57,900 $29,331
344,461
kWh
-
05 3.5313: Increase amount of waste recovered for resale $1,052 - - $1,052
-
lb
TOTAL RECOMMENDED $62,218 $74,034 $61,166
718,333
kWh
$1,052
-
lb
TOTAL IMPLEMENTED $36,831 $62,366 $35,779
420,178
kWh
$1,052
-
lb
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs