ITAC Assessment: SF0190
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Gourmet Specialty Foods
NAICS
n/a
SIC 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 55,000
ft2
Annual Production 9,000,000
lb
Production Hrs. Annual 4,789
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $133,540 1,643,980
kWh
Electricity Demand $17,137 4,174
kW-mo/yr
Natural Gas $35,452 5,649
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $82,011 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $67,953

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.7124: Make a practice of turning off lights when not needed $1,188 - $1,188
14,634
kWh
- -
02 2.6218: Turn off equipment when not in use $2,105 - $2,105
22,987
kWh
- -
03 2.7124: Make a practice of turning off lights when not needed $2,740 - $2,740
33,746
kWh
- -
04 2.6231: Utilize controls to operate equipment only when needed $1,090 $296 $1,090
10,718
kWh
- -
05 2.7135: Install occupancy sensors $6,043 $1,750 $6,043
70,437
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,970 $1,123 $2,970
34,603
kWh
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $12,968 $29,300 $12,968
143,380
kWh
- -
08 3.5217: Reuse / recycle/ sell paper products $4,565 - - $4,565
-
lb
-
09 3.5248: Separate and recycle scrap metal to foundry or for sale $6,079 - - $6,079
-
lb
-
10 4.111: Add equipment/ operators to reduce production bottleneck $42,263 $32,184 - - $42,263
TOTAL RECOMMENDED $82,011 $64,653 $29,104
330,505
kWh
$10,644
-
lb
$42,263
TOTAL IMPLEMENTED $67,953 $35,057 $15,046
176,407
kWh
$10,644
-
lb
$42,263
Yearly Savings* Imp'd Cost* Electricity Usage Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs