Assessment Year | 2000 |
---|---|
Principal Product | Tin Cans |
NAICS |
n/a
|
SIC | 3411: Metal Cans |
Sales Range | $10 M to 50M |
# of Employees | 85 |
Plant Area |
100,000
ft2
|
Annual Production | 350,000,000
pieces
|
Production Hrs. Annual | 6,456
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $184,180 | 3,099,861 |
kWh
|
$0.059 |
Electricity Demand | $90,523 | 7,094 |
kW-mo/yr
|
$12.76 |
Natural Gas | $35,614 | 6,427 |
MMBtu
|
$5.54 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $52,918 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7132: Install timers on light switches in little used areas | $2,117 | $2,000 |
$1,676
33,855
kWh
|
$441
-
kW-mo/yr
|
- | - | - | |
02 | 2.4239: Eliminate or reduce compressed air usage | $1,374 | $1,180 |
$1,034
20,898
kWh
|
$340
-
kW-mo/yr
|
- | - | - | |
03 | 2.1121: Use insulation in furnaces to facilitate heating / cooling | $2,040 | $4,040 | - | - |
$2,040
-
MMBtu
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,799 | $5,490 |
$1,353
27,332
kWh
|
$446
-
kW-mo/yr
|
- | - | - | |
05 | 3.5311: Recover and reuse waste material | $3,301 | - | - | - | - |
$3,301
-
lb
|
- | |
06 | 3.6111: Use alternative flocculent to minimize sludge volume | $42,287 | $34,300 | - | - | - |
$12,937
-
lb
|
$29,350 | |
TOTAL RECOMMENDED | $52,918 | $47,010 |
$4,063
82,085
kWh
|
$1,227
-
kW-mo/yr
|
$2,040
-
MMBtu
|
$16,238
-
lb
|
$29,350 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs