ITAC Assessment: SF0188
ITAC logo
ITAC Assessment: SF0188
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Tin Cans
NAICS
n/a
SIC 3411: Metal Cans
Sales Range $10
M
to 50
M
# of Employees 85
Plant Area 100,000
ft2
Annual Production 350,000,000
pieces
Production Hrs. Annual 6,456
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $184,180 3,099,861
kWh
Electricity Demand $90,523 7,094
kW-mo/yr
Natural Gas $35,614 6,427
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $52,918 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.7132: Install timers on light switches in little used areas $2,117 $2,000 $1,676
33,855
kWh
$441
-
kW-mo/yr
- - -
02 2.4239: Eliminate or reduce compressed air usage $1,374 $1,180 $1,034
20,898
kWh
$340
-
kW-mo/yr
- - -
03 2.1121: Use insulation in furnaces to facilitate heating / cooling $2,040 $4,040 - - $2,040
-
MMBtu
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,799 $5,490 $1,353
27,332
kWh
$446
-
kW-mo/yr
- - -
05 3.5311: Recover and reuse waste material $3,301 - - - - $3,301
-
lb
-
06 3.6111: Use alternative flocculent to minimize sludge volume $42,287 $34,300 - - - $12,937
-
lb
$29,350
TOTAL RECOMMENDED $52,918 $47,010 $4,063
82,085
kWh
$1,227
-
kW-mo/yr
$2,040
-
MMBtu
$16,238
-
lb
$29,350
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs