ITAC Assessment: SF0185
ITAC logo
ITAC Assessment: SF0185
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Transformers
NAICS
n/a
SIC 3612: Power, Distribution, and Specialty Transformers
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area 135,000
ft2
Annual Production 80
pieces
Production Hrs. Annual 4,420
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $148,905 2,589,818
kWh
Electricity Demand $98,443 10,866
kW-mo/yr
Natural Gas $25,050 4,278
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $81,703 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,056

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,221 - $1,221
21,093
kWh
- -
02 2.4133: Use most efficient type of electric motors $1,327 $2,998 $1,327
22,922
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,017 $14,420 $4,017
69,381
kWh
- -
04 2.7135: Install occupancy sensors $1,208 $4,500 $1,208
20,861
kWh
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $488 $2,166 $488
8,450
kWh
- -
06 3.5313: Increase amount of waste recovered for resale $1,818 - - $1,818
-
lb
-
07 3.5248: Separate and recycle scrap metal to foundry or for sale $848 - - $848
-
lb
-
08 4.111: Add equipment/ operators to reduce production bottleneck $15,600 $89,000 - $15,600
-
lb
-
09 2.2314: Replace heat treating oven with more efficient unit $27,526 $28,000 $27,526
475,200
kWh
- -
10 4.711: Initiate a total quality management program $27,650 $130,000 - - $27,650
TOTAL RECOMMENDED $81,703 $271,084 $35,787
617,907
kWh
$18,266
-
lb
$27,650
TOTAL IMPLEMENTED $7,056 $14,420 $5,238
90,474
kWh
$1,818
-
lb
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs