| Assessment Year | 2000 |
|---|---|
| Principal Product | Transformers |
| NAICS |
n/a
|
| SIC | 3612: Power, Distribution, and Specialty Transformers |
| Sales Range | $10 M to 50M |
| # of Employees | 160 |
| Plant Area |
135,000
ft2
|
| Annual Production | 80
pieces
|
| Production Hrs. Annual | 4,420
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $148,905 | 2,589,818 |
kWh
|
$0.057 |
| Electricity Demand | $98,443 | 10,866 |
kW-mo/yr
|
$9.06 |
| Natural Gas | $25,050 | 4,278 |
MMBtu
|
$5.86 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $81,703 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $7,056 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,221 | - |
$1,221
21,093
kWh
|
- | - | |
| 02 | 2.4133: Use most efficient type of electric motors | $1,327 | $2,998 |
$1,327
22,922
kWh
|
- | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,017 | $14,420 |
$4,017
69,381
kWh
|
- | - | |
| 04 | 2.7135: Install occupancy sensors | $1,208 | $4,500 |
$1,208
20,861
kWh
|
- | - | |
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $488 | $2,166 |
$488
8,450
kWh
|
- | - | |
| 06 | 3.5313: Increase amount of waste recovered for resale | $1,818 | - | - |
$1,818
-
lb
|
- | |
| 07 | 3.5248: Separate and recycle scrap metal to foundry or for sale | $848 | - | - |
$848
-
lb
|
- | |
| 08 | 4.111: Add equipment/ operators to reduce production bottleneck | $15,600 | $89,000 | - |
$15,600
-
lb
|
- | |
| 09 | 2.2314: Replace heat treating oven with more efficient unit | $27,526 | $28,000 |
$27,526
475,200
kWh
|
- | - | |
| 10 | 4.711: Initiate a total quality management program | $27,650 | $130,000 | - | - | $27,650 | |
| TOTAL RECOMMENDED | $81,703 | $271,084 |
$35,787
617,907
kWh
|
$18,266
-
lb
|
$27,650 | ||
| TOTAL IMPLEMENTED | $7,056 | $14,420 |
$5,238
90,474
kWh
|
$1,818
-
lb
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs