ITAC Assessment: SF0184
ITAC logo
ITAC Assessment: SF0184
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Salty Snacks
NAICS
n/a
SIC 2096: Potato Chips, Corn Chips, and Similar Snacks
Sales Range $50
M
to 100
M
# of Employees 180
Plant Area 124,000
ft2
Annual Production 20,000,000
lb
Production Hrs. Annual 5,330
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $354,465 3,523,680
kWh
Electricity Demand $106,036 8,823
kW-mo/yr
Natural Gas $408,752 111,959
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $152,796 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.2437: Recover waste heat from equipment $1,959 - $1,319
21,981
kWh
$640
-
kW-mo/yr
- - -
02 2.7135: Install occupancy sensors $2,262 $840 $1,522
25,205
kWh
$740
-
kW-mo/yr
- - -
03 2.4239: Eliminate or reduce compressed air usage $7,576 $5,200 $5,098
84,701
kWh
$2,478
-
kW-mo/yr
- - -
04 2.2511: Insulate bare equipment $1,075 $956 - - $1,075
-
MMBtu
- -
05 2.4133: Use most efficient type of electric motors $1,881 $2,455 $1,266
21,102
kWh
$615
-
kW-mo/yr
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $7,009 $10,260 $4,578
76,202
kWh
$2,431
-
kW-mo/yr
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $2,128 $6,420 $1,685
20,809
kWh
$443
-
kW-mo/yr
- - -
08 2.4322: Use or replace with energy efficient substitutes $21,696 $850 $(-144.0)
(-2,345)
kWh
- - - $21,840
09 4.131: Modify process to reduce material use/cost $63,815 $35,960 - - - $4,119
-
lb
$59,696
10 4.711: Initiate a total quality management program $43,395 $130,000 - - - - $43,395
TOTAL RECOMMENDED $152,796 $192,941 $15,324
247,655
kWh
$7,347
-
kW-mo/yr
$1,075
-
MMBtu
$4,119
-
lb
$124,931
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs