Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Printing Plates and Dies
NAICS
n/a
SIC 2796: Platemaking and Related Services
Sales Range $5
M
to 10
M
# of Employees 80
Plant Area 36,000
ft2
Annual Production 11,000
thousand feet
Production Hrs. Annual 6,656
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $38,894 838,804
kWh
Electricity Demand $12,786 2,046
kW-mo/yr
Natural Gas $329 28
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,590 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.7135: Install occupancy sensors $761 $720 $592
12,896
kWh
$169
-
kW-mo/yr
- -
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,990 $3,103 $3,010
64,771
kWh
$557
-
kW-mo/yr
$(-1,577.0)
-
MMBtu
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $8,492 $15,620 $6,599
142,438
kWh
$1,893
-
kW-mo/yr
- -
04 3.5313: Increase amount of waste recovered for resale $838 - - - - $838
-
lb
05 3.5313: Increase amount of waste recovered for resale $509 - - - - $509
-
lb
TOTAL RECOMMENDED $12,590 $19,443 $10,201
220,105
kWh
$2,619
-
kW-mo/yr
$(-1,577.0)
-
MMBtu
$1,347
-
lb
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs