Assessment Year | 1999 |
---|---|
Principal Product | Nutritional Suplements |
NAICS |
n/a
|
SIC | 2834: Pharmaceutical Preparations |
Sales Range | $1 M to 5M |
# of Employees | 35 |
Plant Area |
17,000
ft2
|
Annual Production | 1,300,000
pieces
|
Production Hrs. Annual | 2,730
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $16,552 | 227,726 |
kWh
|
$0.073 |
Electricity Demand | $4,000 | 717 |
kW-mo/yr
|
$5.58 |
Natural Gas | $6,152 | 985 |
MMBtu
|
$6.25 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $71,514 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $36,310 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7135: Install occupancy sensors | $276 | $480 |
$206
2,931
kWh
|
$70
-
kW-mo/yr
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,662 | $6,782 |
$2,065
28,429
kWh
|
$597
-
kW-mo/yr
|
- | - | |
03 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $564 | $2,476 |
$564
7,913
kWh
|
- | - | - | |
04 | 3.5248: Separate and recycle scrap metal to foundry or for sale | $1,350 | $150 | - | - |
$1,350
-
lb
|
- | |
05 | 3.5313: Increase amount of waste recovered for resale | $600 | $150 | - | - |
$600
-
lb
|
- | |
06 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $312 | $150 | - | - |
$312
-
lb
|
- | |
07 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $6,334 | $8,650 | - | - |
$6,334
-
lb
|
- | |
08 | 4.652: Replace existing equipment with more suitable substitutes | $7,000 | $838 | - | - | - | $7,000 | |
09 | 4.445: Install equipment to move product | $26,208 | $33,300 | - | - | - | $26,208 | |
10 | 4.445: Install equipment to move product | $26,208 | $33,300 | - | - | - | $26,208 | |
TOTAL RECOMMENDED | $71,514 | $86,276 |
$2,835
39,273
kWh
|
$667
-
kW-mo/yr
|
$8,596
-
lb
|
$59,416 | ||
TOTAL IMPLEMENTED | $36,310 | $37,544 |
$770
10,844
kWh
|
$70
-
kW-mo/yr
|
$2,262
-
lb
|
$33,208 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs