ITAC Assessment: SF0177
ITAC logo
ITAC Assessment: SF0177
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Semiconductor Etching Equipment
NAICS
n/a
SIC 3559: Special Industry Machinery, Not Elsewhere Classified
Sales Range less than $500
k
# of Employees 140
Plant Area 120,000
ft2
Annual Production 84
pieces
Production Hrs. Annual 2,830
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $312,079 5,917,351
kWh
Electricity Demand $140,002 10,342
kW-mo/yr
Natural Gas $35,530 6,695
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $301,357 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $228,527

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.6218: Turn off equipment when not in use $954 - $954
18,171
kWh
- - -
02 2.7226: Use computer programs to optimize hvac performance $88,107 $21,913 $82,190
1,559,789
kWh
$5,917
-
kW-mo/yr
- -
03 2.4133: Use most efficient type of electric motors $2,195 $2,425 $1,597
30,188
kWh
$598
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $29,353 $51,620 $19,491
369,871
kWh
$9,862
-
kW-mo/yr
- -
05 2.7124: Make a practice of turning off lights when not needed $8,353 $18,000 $8,353
158,558
kWh
- - -
06 3.5315: Lease / purchase baler; sell cardboard to recycler $818 - - - $818
-
lb
-
07 4.521: Clear and rent existing space $107,100 $6,400 - - - $107,100
08 2.8114: Change rate schedules or other changes in utility service $61,603 $115,000 - - - $61,603
09 2.3212: Optimize plant power factor $2,874 $5,535 - - - $2,874
TOTAL RECOMMENDED $301,357 $220,893 $112,585
2,136,577
kWh
$16,377
-
kW-mo/yr
$818
-
lb
$171,577
TOTAL IMPLEMENTED $228,527 $82,358 $104,232
1,978,019
kWh
$16,377
-
kW-mo/yr
$818
-
lb
$107,100
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs