ITAC Assessment: SF0173
ITAC logo
ITAC Assessment: SF0173
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Polystyrene Loosefill
NAICS
n/a
SIC 3085: Plastics Bottles
Sales Range $1
M
to 5
M
# of Employees 20
Plant Area 41,000
ft2
Annual Production 7,000,000
units
Production Hrs. Annual 4,000
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $79,222 975,674
kWh
Electricity Demand $15,836 3,680
kW-mo/yr
Natural Gas $47,287 8,297
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $188,310 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $358 $451 $307
3,810
kWh
$51
-
kW-mo/yr
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $269 $506 $232
2,931
kWh
$37
-
kW-mo/yr
- -
03 2.7135: Install occupancy sensors $423 $1,200 $365
4,396
kWh
$58
-
kW-mo/yr
- -
04 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $1,455 $7,000 $1,255
15,533
kWh
$200
-
kW-mo/yr
- -
05 3.6193: Install equipment (eg compactor) to reduce disposal costs $14,305 $14,475 - - $12,555
-
lb
$1,750
06 4.513: Re-arrange equipment layout to reduce labor costs $56,000 - - - - $56,000
07 4.652: Replace existing equipment with more suitable substitutes $3,500 $164 - - - $3,500
08 4.513: Re-arrange equipment layout to reduce labor costs $112,000 $49,860 - - - $112,000
TOTAL RECOMMENDED $188,310 $73,656 $2,159
26,670
kWh
$346
-
kW-mo/yr
$12,555
-
lb
$173,250
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs