ITAC Assessment: SF0172
ITAC logo
ITAC Assessment: SF0172
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Bakers Yeast
NAICS
n/a
SIC 2053: Frozen Bakery Products, Except Bread
Sales Range $10
M
to 50
M
# of Employees 97
Plant Area 132,000
ft2
Annual Production 70,000,000
lb
Production Hrs. Annual 6,864
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $741,045 15,072,099
kWh
Electricity Demand $372,828 34,521
kW-mo/yr
Natural Gas $264,498 88,625
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $436,558 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $226,916

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.1231: Establish burner maintenance schedule for boilers $7,540 - - - $7,540
-
MMBtu
- - -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $6,924 $1,958 $5,003
101,700
kWh
$1,921
-
kW-mo/yr
- - - -
03 2.2511: Insulate bare equipment $1,121 $825 - - $1,121
-
MMBtu
- - -
04 2.7135: Install occupancy sensors $2,054 $1,800 $1,434
29,015
kWh
$620
-
kW-mo/yr
- - - -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,100 $15,856 $10,416
205,158
kWh
$1,684
-
kW-mo/yr
- - - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $124,530 $236,733 $89,957
1,829,719
kWh
$34,573
-
kW-mo/yr
- - - -
07 2.4133: Use most efficient type of electric motors $4,368 $7,209 $3,156
64,185
kWh
$1,212
-
kW-mo/yr
- - - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $6,548 $14,600 $4,010
81,477
kWh
$2,538
-
kW-mo/yr
- - - -
09 2.2437: Recover waste heat from equipment $8,448 $21,777 - - $8,448
-
MMBtu
- - -
10 2.7134: Use photocell controls $5,543 $21,500 $4,005
81,477
kWh
$1,538
-
kW-mo/yr
- - - -
11 3.5314: Use in-process recycling whenever possible $960 - - - - - $960
-
lb
-
12 3.5313: Increase amount of waste recovered for resale $10,400 - - - - - $10,400
-
lb
-
13 3.5316: Contract a wood pallet recycling company $1,632 $250 - - - - $1,632
-
lb
-
14 2.8122: Use utility controlled power management $138,720 $11,500 - - - - - $138,720
15 2.8122: Use utility controlled power management $1,726 - - - - - - $1,726
16 2.8122: Use utility controlled power management $44,655 $23,000 - - - - - $44,655
17 2.3212: Optimize plant power factor $3,752 $9,602 - - - - - $3,752
18 3.4116: Meter recycled water (to reduce sewer charges) $55,537 $10,830 - - - $55,537
-
Tgal
- -
TOTAL RECOMMENDED $436,558 $377,440 $117,981
2,392,731
kWh
$44,086
-
kW-mo/yr
$17,109
-
MMBtu
$55,537
-
Tgal
$12,992
-
lb
$188,853
TOTAL IMPLEMENTED $226,916 $68,069 $9,593
194,900
kWh
$3,753
-
kW-mo/yr
$17,109
-
MMBtu
- $11,360
-
lb
$185,101
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs