ITAC Assessment: NV0067
ITAC logo
ITAC Assessment: NV0067
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Polyethylene Pipes
NAICS
n/a
SIC 3084: Plastics Pipe
Sales Range $10
M
to 50
M
# of Employees 26
Plant Area 45,000
ft2
Annual Production 15,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $198,520 4,530,188
kWh
Electricity Demand $78,100 9,830
kW-mo/yr
Electricity Fees $9,003 -
Natural Gas $6,129 1,181
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,398 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,001

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings
01 2.4133: Use most efficient type of electric motors $5,845 $197 $4,801
109,613
kWh
$954
-
kW-mo/yr
$90 -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $419 $18 $335
7,620
kWh
$84
-
kW-mo/yr
- -
03 2.7111: Reduce illumination to minimum necessary levels $2,487 $45 $2,010
45,721
kWh
$477
-
kW-mo/yr
- -
04 2.2511: Insulate bare equipment $2,646 $1,085 $2,646
60,375
kWh
- - -
05 2.3137: Use power during off-peak periods $14,885 - - $13,530
-
kW-mo/yr
$1,355 -
06 2.3212: Optimize plant power factor $1,021 - - - $1,021 -
07 3.5212: Regrind, reuse, or sell scrap plastic parts $1,095 - - - - $1,095
-
lb
TOTAL RECOMMENDED $28,398 $1,345 $9,792
223,329
kWh
$15,045
-
kW-mo/yr
$2,466 $1,095
-
lb
TOTAL IMPLEMENTED $17,001 - - $13,530
-
kW-mo/yr
$2,376 $1,095
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs