| Assessment Year | 1996 |
|---|---|
| Principal Product | Polyethylene Pipes |
| NAICS |
n/a
|
| SIC | 3084: Plastics Pipe |
| Sales Range | $10 M to 50M |
| # of Employees | 26 |
| Plant Area |
45,000
ft2
|
| Annual Production | 15,000,000
lb
|
| Production Hrs. Annual | 8,736
hrs
|
| Location (State) | Nevada |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $198,520 | 4,530,188 |
kWh
|
$0.044 |
| Electricity Demand | $78,100 | 9,830 |
kW-mo/yr
|
$7.95 |
| Electricity Fees | $9,003 | - |
|
- |
| Natural Gas | $6,129 | 1,181 |
MMBtu
|
$5.19 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $28,398 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $17,001 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Solid Waste (non-haz) Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $5,845 | $197 |
$4,801
109,613
kWh
|
$954
-
kW-mo/yr
|
$90 | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $419 | $18 |
$335
7,620
kWh
|
$84
-
kW-mo/yr
|
- | - | |
| 03 | 2.7111: Reduce illumination to minimum necessary levels | $2,487 | $45 |
$2,010
45,721
kWh
|
$477
-
kW-mo/yr
|
- | - | |
| 04 | 2.2511: Insulate bare equipment | $2,646 | $1,085 |
$2,646
60,375
kWh
|
- | - | - | |
| 05 | 2.3137: Use power during off-peak periods | $14,885 | - | - |
$13,530
-
kW-mo/yr
|
$1,355 | - | |
| 06 | 2.3212: Optimize plant power factor | $1,021 | - | - | - | $1,021 | - | |
| 07 | 3.5212: Regrind, reuse, or sell scrap plastic parts | $1,095 | - | - | - | - |
$1,095
-
lb
|
|
| TOTAL RECOMMENDED | $28,398 | $1,345 |
$9,792
223,329
kWh
|
$15,045
-
kW-mo/yr
|
$2,466 |
$1,095
-
lb
|
||
| TOTAL IMPLEMENTED | $17,001 | - | - |
$13,530
-
kW-mo/yr
|
$2,376 |
$1,095
-
lb
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Solid Waste (non-haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs