ITAC Assessment: OK0345
ITAC logo
ITAC Assessment: OK0345
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product GLASS CONTAINERS
NAICS
n/a
SIC 3221: Glass Containers
Sales Range $50
M
to 100
M
# of Employees 380
Plant Area
n/a
Annual Production 191,000
ton
Production Hrs. Annual 8,640
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $857,320 53,495,311
kWh
Natural Gas $2,027,134 1,204,479
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $144,787 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $144,787

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $131,560 $248,667 $131,560
5,348,183
kWh
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,008 $4,500 $4,008
122,216
kWh
- -
03 2.2425: Use flue gases to heat process or service water $3,564 $13,345 $(-53.0)
(-2,052)
kWh
$3,617
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $264 $519 $264
9,379
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $5,391 - $3,891
116,061
kWh
- $1,500
TOTAL RECOMMENDED $144,787 $267,031 $139,670
5,593,787
kWh
$3,617
-
MMBtu
$1,500
TOTAL IMPLEMENTED $144,787 $267,031 $139,670
5,593,787
kWh
$3,617
-
MMBtu
$1,500
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs