ITAC Assessment: SF0157
ITAC logo
ITAC Assessment: SF0157
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Printed Paper
NAICS
n/a
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 96
Plant Area 66,000
ft2
Annual Production 49,500,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $133,948 2,151,817
kWh
Electricity Demand $92,162 2,945
kW-mo/yr
Natural Gas $594 75
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $123,302 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,608

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7135: Install occupancy sensors $1,834 $1,456 $1,040
16,706
kWh
$794
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $18,418 $45,400 $10,534
169,109
kWh
$7,884
-
kW-mo/yr
- - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $396 $2,106 $283
4,689
kWh
$113
-
kW-mo/yr
- - -
04 3.5313: Increase amount of waste recovered for resale $3,602 - - - $3,602
-
lb
- -
05 3.5316: Contract a wood pallet recycling company $960 $250 - - $960
-
lb
- -
06 3.5315: Lease / purchase baler; sell cardboard to recycler $19,132 $49,350 - - $19,132
-
lb
- -
07 4.212: Adopt in-house material generation $78,960 $30,000 - - - $(-32,760.0) $111,720
TOTAL RECOMMENDED $123,302 $128,562 $11,857
190,504
kWh
$8,791
-
kW-mo/yr
$23,694
-
lb
$(-32,760.0) $111,720
TOTAL IMPLEMENTED $21,608 $49,212 $11,857
190,504
kWh
$8,791
-
kW-mo/yr
$960
-
lb
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs