ITAC Assessment: SF0154
ITAC logo
ITAC Assessment: SF0154
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Tomato Paste
NAICS
n/a
SIC 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area 1,219,680
ft2
Annual Production 60,000,000
lb
Production Hrs. Annual 2,016
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $286,905 5,410,610
kWh
Electricity Demand $199,687 11,260
kW-mo/yr
Natural Gas $840,808 252,710
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $166,975 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,782

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1231: Establish burner maintenance schedule for boilers $3,242 - - - $3,242
-
MMBtu
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $112,256 $73,966 $38,290
722,157
kWh
$73,966
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,646 $4,900 $1,886
35,463
kWh
$3,760
-
kW-mo/yr
-
04 2.1243: Use heat from boiler blowdown to preheat boiler feed water $15,577 $17,000 - - $15,577
-
MMBtu
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,270 $17,928 $4,103
77,374
kWh
$8,167
-
kW-mo/yr
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,837 $5,310 $961
18,171
kWh
$2,876
-
kW-mo/yr
-
07 2.2121: Increase amount of condensate returned $3,288 $6,477 - - $3,288
-
MMBtu
08 2.7142: Utilize higher efficiency lamps and/or ballasts $3,681 $9,290 $1,475
29,015
kWh
$2,206
-
kW-mo/yr
-
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,664 $4,281 $561
10,551
kWh
$1,103
-
kW-mo/yr
-
10 2.7134: Use photocell controls $1,549 $9,500 $521
9,672
kWh
$1,028
-
kW-mo/yr
-
11 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,965 $24,395 $1,323
24,912
kWh
$2,642
-
kW-mo/yr
-
TOTAL RECOMMENDED $166,975 $173,047 $49,120
927,315
kWh
$95,748
-
kW-mo/yr
$22,107
-
MMBtu
TOTAL IMPLEMENTED $15,782 $27,971 $4,443
84,701
kWh
$8,097
-
kW-mo/yr
$3,242
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs