ITAC Assessment: SF0151
ITAC logo
ITAC Assessment: SF0151
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Formaldehyde and Resins
NAICS
n/a
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $10
M
to 50
M
# of Employees 25
Plant Area 1,437,480
ft2
Annual Production 245,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $275,426 5,390,680
kWh
Electricity Demand $117,147 10,508
kW-mo/yr
Natural Gas $146,034 41,602
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $255,520 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $245,424

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
01 2.4322: Use or replace with energy efficient substitutes $45,578 $21,000 $32,109
628,370
kWh
$13,469
-
kW-mo/yr
- - -
02 2.4133: Use most efficient type of electric motors $2,120 $3,259 $1,481
29,015
kWh
$639
-
kW-mo/yr
- - -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,792 $5,123 $2,056
40,152
kWh
$736
-
kW-mo/yr
- - -
04 2.2511: Insulate bare equipment $1,694 $5,068 - - $1,694
-
MMBtu
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $4,820 $15,700 $3,036
59,496
kWh
$1,784
-
kW-mo/yr
- - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,572 $8,872 $944
18,464
kWh
$1,628
-
kW-mo/yr
- - -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,404 $19,349 $3,252
66,237
kWh
$2,152
-
kW-mo/yr
- - -
08 3.4113: Treat and reuse rinse waters $1,220 $4,835 - - - $1,220
-
Tgal
-
09 4.652: Replace existing equipment with more suitable substitutes $187,200 $36,000 - - - - $187,200
10 3.6112: Use filter and drying oven to reduce sludge volume $2,120 $6,210 - - - - $2,120
TOTAL RECOMMENDED $255,520 $125,416 $42,878
841,734
kWh
$20,408
-
kW-mo/yr
$1,694
-
MMBtu
$1,220
-
Tgal
$189,320
TOTAL IMPLEMENTED $245,424 $90,985 $38,682
757,033
kWh
$16,628
-
kW-mo/yr
$1,694
-
MMBtu
$1,220
-
Tgal
$187,200
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs