ITAC Assessment: SF0147
ITAC logo
ITAC Assessment: SF0147
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Commercial Printing
NAICS
n/a
SIC 2799:
Sales Range $10
M
to 50
M
# of Employees 82
Plant Area 44,000
ft2
Annual Production 500
ton
Production Hrs. Annual 4,680
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $97,786 1,200,469
kWh
Electricity Demand $18,184 4,279
kW-mo/yr
Natural Gas $1,121 145
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $228,420 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,772

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.7135: Install occupancy sensors $1,612 $2,400 $1,391
16,999
kWh
$221
-
kW-mo/yr
- -
02 2.4133: Use most efficient type of electric motors $373 $607 $320
3,810
kWh
$53
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $12,399 $31,690 $10,794
132,474
kWh
$1,605
-
kW-mo/yr
- -
04 3.5313: Increase amount of waste recovered for resale $787 $125 - - $787
-
lb
-
05 4.422: Utilize outside contracting $213,249 - $11,804
144,783
kWh
$1,445
-
kW-mo/yr
- $200,000
TOTAL RECOMMENDED $228,420 $34,822 $24,309
298,066
kWh
$3,324
-
kW-mo/yr
$787
-
lb
$200,000
TOTAL IMPLEMENTED $12,772 $32,297 $11,114
136,284
kWh
$1,658
-
kW-mo/yr
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs