ITAC Assessment: SD0476
ITAC logo
ITAC Assessment: SD0476
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Recycled water
NAICS 221310: Water Supply and Irrigation Systems
SIC 4952: Sewerage Systems
Sales Range less than $500
k
# of Employees 25
Plant Area 200,000
ft2
Annual Production 1,000,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $197,533 2,791,582
kWh
Electricity Demand $104,171 6,210
kW-mo/yr
Natural Gas $13,749 2,646
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $116,563 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,340

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.3412: Use waste heat to produce steam to drive a steam turbine-generator $78,108 $360,000 $70,704
998,640
kWh
$21,734
-
kW-mo/yr
$(-19,973.0) $5,643
-
MMBtu
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $23,282 $33,000 $18,404
259,945
kWh
$4,878
-
kW-mo/yr
- -
03 2.1116: Improve combustion control capability $6,115 $200 - - - $6,115
-
MMBtu
04 2.4239: Eliminate or reduce compressed air usage $5,485 $13,830 $4,266
60,259
kWh
$1,219
-
kW-mo/yr
- -
05 2.4133: Use most efficient type of electric motors $3,573 $6,995 $2,573
36,360
kWh
$1,000
-
kW-mo/yr
- -
TOTAL RECOMMENDED $116,563 $414,025 $95,947
1,355,204
kWh
$28,831
-
kW-mo/yr
$(-19,973.0) $11,758
-
MMBtu
TOTAL IMPLEMENTED $32,340 $53,825 $25,243
356,564
kWh
$7,097
-
kW-mo/yr
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs