| Assessment Year | 2013 |
|---|---|
| Principal Product | Recycled water |
| NAICS | 221310: Water Supply and Irrigation Systems |
| SIC | 4952: Sewerage Systems |
| Sales Range | less than $500 k |
| # of Employees | 25 |
| Plant Area |
200,000
ft2
|
| Annual Production | 1,000,000
Tgal
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $197,533 | 2,791,582 |
kWh
|
$0.071 |
| Electricity Demand | $104,171 | 6,210 |
kW-mo/yr
|
$16.77 |
| Natural Gas | $13,749 | 2,646 |
MMBtu
|
$5.20 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $116,563 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $32,340 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.3412: Use waste heat to produce steam to drive a steam turbine-generator | $78,108 | $360,000 |
$70,704
998,640
kWh
|
$21,734
-
kW-mo/yr
|
$(-19,973.0) |
$5,643
-
MMBtu
|
|
| 02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $23,282 | $33,000 |
$18,404
259,945
kWh
|
$4,878
-
kW-mo/yr
|
- | - | |
| 03 | 2.1116: Improve combustion control capability | $6,115 | $200 | - | - | - |
$6,115
-
MMBtu
|
|
| 04 | 2.4239: Eliminate or reduce compressed air usage | $5,485 | $13,830 |
$4,266
60,259
kWh
|
$1,219
-
kW-mo/yr
|
- | - | |
| 05 | 2.4133: Use most efficient type of electric motors | $3,573 | $6,995 |
$2,573
36,360
kWh
|
$1,000
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $116,563 | $414,025 |
$95,947
1,355,204
kWh
|
$28,831
-
kW-mo/yr
|
$(-19,973.0) |
$11,758
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $32,340 | $53,825 |
$25,243
356,564
kWh
|
$7,097
-
kW-mo/yr
|
- | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs