ITAC Assessment: SF0139
ITAC logo
ITAC Assessment: SF0139
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Automobile Seats and Headliners
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $50
M
to 100
M
# of Employees 225
Plant Area 120,000
ft2
Annual Production 365,000
pieces
Production Hrs. Annual 8,568
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $390,828 6,296,307
kWh
Electricity Demand $202,630 12,525
kW-mo/yr
Natural Gas $4,941 764
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $579,517 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $355,574

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,317 - $2,011
18,757
kWh
$306
-
kW-mo/yr
- - -
02 2.6218: Turn off equipment when not in use $182 - $182
3,224
kWh
- - - -
03 2.6218: Turn off equipment when not in use $1,895 $506 $1,895
33,411
kWh
- - - -
04 2.1224: Replace boiler $22,352 $9,600 $20,389
359,906
kWh
$10,322
-
kW-mo/yr
$(-8,359.0)
-
MMBtu
- -
05 2.1224: Replace boiler $1,885 $1,227 $2,227
39,273
kWh
$691
-
kW-mo/yr
$(-1,033.0)
-
MMBtu
- -
06 2.4133: Use most efficient type of electric motors $1,855 $1,430 $1,230
19,930
kWh
$625
-
kW-mo/yr
- - -
07 2.2122: Install / repair insulation on condensate lines $646 $671 $646
11,430
kWh
- - - -
08 2.4237: Substitute compressed air cooling with water or air cooling $327 $370 $197
5,862
kWh
$130
-
kW-mo/yr
- - -
09 2.1223: Install smaller boiler (increase high fire duty cycle) $21,444 $24,400 $18,372
324,150
kWh
$11,489
-
kW-mo/yr
$(-8,417.0)
-
MMBtu
- -
10 2.7135: Install occupancy sensors $823 $2,240 $478
8,499
kWh
$345
-
kW-mo/yr
- - -
11 2.7142: Utilize higher efficiency lamps and/or ballasts $9,352 $26,690 $6,818
120,457
kWh
$2,534
-
kW-mo/yr
- - -
12 3.5248: Separate and recycle scrap metal to foundry or for sale $24,633 $150 - - - $24,633
-
lb
-
13 3.5313: Increase amount of waste recovered for resale $36,406 $150 - - - $36,406
-
lb
-
14 3.5316: Contract a wood pallet recycling company $6,916 $150 - - - $6,916
-
lb
-
15 3.5313: Increase amount of waste recovered for resale $3,448 - - - - $3,448
-
lb
-
16 3.5315: Lease / purchase baler; sell cardboard to recycler $25,974 $8,150 - - - $25,974
-
lb
-
17 4.212: Adopt in-house material generation $80,062 $65,500 - - - - $80,062
18 4.111: Add equipment/ operators to reduce production bottleneck $339,000 $150,000 - - - - $339,000
TOTAL RECOMMENDED $579,517 $291,234 $54,445
944,899
kWh
$26,442
-
kW-mo/yr
$(-17,809.0)
-
MMBtu
$97,377
-
lb
$419,062
TOTAL IMPLEMENTED $355,574 $179,667 $12,979
213,071
kWh
$3,595
-
kW-mo/yr
- - $339,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs