ITAC Assessment: SF0119
ITAC logo
ITAC Assessment: SF0119
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Laser Cut & Engraved Products
NAICS
n/a
SIC 2499: Wood Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 80,000
ft2
Annual Production 43,000
thousand feet
Production Hrs. Annual 8,736
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $245,439 4,099,062
kWh
Electricity Demand $130,462 10,320
kW-mo/yr
Natural Gas $14,695 2,432
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $797,507 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $783,445

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $13,708 $30,720 $9,494
158,558
kWh
$4,214
-
kW-mo/yr
- - -
02 2.4133: Use most efficient type of electric motors $871 $514 $622
10,258
kWh
$249
-
kW-mo/yr
- - -
03 2.4239: Eliminate or reduce compressed air usage $812 $3,000 $805
13,482
kWh
$7
-
kW-mo/yr
- - -
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $354 $845 $393
6,448
kWh
$114
-
kW-mo/yr
$(-153.0)
-
MMBtu
- -
05 3.5315: Lease / purchase baler; sell cardboard to recycler $1,872 $250 - - - $1,872
-
lb
-
06 3.5313: Increase amount of waste recovered for resale $250 $250 - - - $250
-
lb
-
07 4.432: Cross-train personnel to avoid lost time $779,640 $275,000 - - - - $779,640
TOTAL RECOMMENDED $797,507 $310,579 $11,314
188,746
kWh
$4,584
-
kW-mo/yr
$(-153.0)
-
MMBtu
$2,122
-
lb
$779,640
TOTAL IMPLEMENTED $783,445 $279,014 $1,427
23,740
kWh
$256
-
kW-mo/yr
- $2,122
-
lb
$779,640
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs