ITAC Assessment: IA0152
ITAC logo
ITAC Assessment: IA0152
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product tools and dies
NAICS
n/a
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 225
Plant Area 250,000
ft2
Annual Production 500,000
pieces
Production Hrs. Annual 2,600
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $113,406 3,239,449
kWh
Electricity Demand $7,128 10,284
kW-mo/yr
Natural Gas $67,129 23,297
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,841 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $873

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Water Disposal Savings Solid Waste (haz) Savings
01 3.1161: Eliminate/reduce an operation $3,833 $2,450 - - $3,833
-
lb
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,256 $11,497 $2,256
64,478
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $230 $384 $230
6,448
kWh
- -
04 3.4151: Minimize water usage $1,649 - - $1,649
-
Tgal
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $873 $328 $873
24,912
kWh
- -
TOTAL RECOMMENDED $8,841 $14,659 $3,359
95,838
kWh
$1,649
-
Tgal
$3,833
-
lb
TOTAL IMPLEMENTED $873 $328 $873
24,912
kWh
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs