Assessment Year | 1997 |
---|---|
Principal Product | Flexible Packaging |
NAICS |
n/a
|
SIC | 2759: Commercial Printing, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 60 |
Plant Area |
48,000
ft2
|
Annual Production | 2,400,000,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $70,709 | 1,179,953 |
kWh
|
$0.060 |
Electricity Demand | $20,188 | 2,638 |
kW-mo/yr
|
$7.65 |
Natural Gas | $21,491 | 4,054 |
MMBtu
|
$5.30 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $1,056,049 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $28,956 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $492 | $546 |
$392
6,448
kWh
|
$100
-
kW-mo/yr
|
- | - | - | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $375 | $763 |
$299
4,982
kWh
|
$76
-
kW-mo/yr
|
- | - | - | |
03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $1,601 | $1,204 |
$1,869
31,360
kWh
|
$478
-
kW-mo/yr
|
$(-746.0)
-
MMBtu
|
- | - | |
04 | 2.2511: Insulate bare equipment | $2,869 | $525 |
$2,869
143,611
kWh
|
- | - | - | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $712 | - |
$567
9,379
kWh
|
$145
-
kW-mo/yr
|
- | - | - | |
06 | 3.5316: Contract a wood pallet recycling company | $25,000 | $250 | - | - | - |
$25,000
-
lb
|
- | |
07 | 4.431: Train operators for maximum operating efficiency | $1,025,000 | $10,000 | - | - | - | - | $1,025,000 | |
TOTAL RECOMMENDED | $1,056,049 | $13,288 |
$5,996
195,780
kWh
|
$799
-
kW-mo/yr
|
$(-746.0)
-
MMBtu
|
$25,000
-
lb
|
$1,025,000 | ||
TOTAL IMPLEMENTED | $28,956 | $1,538 |
$3,735
157,972
kWh
|
$221
-
kW-mo/yr
|
- |
$25,000
-
lb
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs