ITAC Assessment: SF0115
ITAC logo
ITAC Assessment: SF0115
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Flexible Packaging
NAICS
n/a
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 48,000
ft2
Annual Production 2,400,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $70,709 1,179,953
kWh
Electricity Demand $20,188 2,638
kW-mo/yr
Natural Gas $21,491 4,054
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,056,049 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,956

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.4133: Use most efficient type of electric motors $492 $546 $392
6,448
kWh
$100
-
kW-mo/yr
- - -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $375 $763 $299
4,982
kWh
$76
-
kW-mo/yr
- - -
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,601 $1,204 $1,869
31,360
kWh
$478
-
kW-mo/yr
$(-746.0)
-
MMBtu
- -
04 2.2511: Insulate bare equipment $2,869 $525 $2,869
143,611
kWh
- - - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $712 - $567
9,379
kWh
$145
-
kW-mo/yr
- - -
06 3.5316: Contract a wood pallet recycling company $25,000 $250 - - - $25,000
-
lb
-
07 4.431: Train operators for maximum operating efficiency $1,025,000 $10,000 - - - - $1,025,000
TOTAL RECOMMENDED $1,056,049 $13,288 $5,996
195,780
kWh
$799
-
kW-mo/yr
$(-746.0)
-
MMBtu
$25,000
-
lb
$1,025,000
TOTAL IMPLEMENTED $28,956 $1,538 $3,735
157,972
kWh
$221
-
kW-mo/yr
- $25,000
-
lb
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs