| Assessment Year | 1985 |
|---|---|
| Principal Product | SYNTHETIC YARN |
| NAICS |
n/a
|
| SIC | 2282: Yarn Texturizing, Throwing, Twisting, and Winding Mills |
| Sales Range | $5 M to 10M |
| # of Employees | 100 |
| Plant Area |
n/a
|
| Annual Production | 3,000,000
lb
|
| Production Hrs. Annual | 6,468
hrs
|
| Location (State) | Rhode Island |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $469,251 | 6,412,954 |
kWh
|
$0.073 |
| Fuel Oil #2 | $33,440 | 5,674 |
MMBtu
|
$5.89 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $22,298 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $13,202 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #2 Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2113: Repair or replace steam traps | $10,926 | $455 | - |
$12,096
-
MMBtu
|
$(-1,170.0) | |
| 02 | 2.2511: Insulate bare equipment | $2,276 | $703 | - |
$2,276
-
MMBtu
|
- | |
| 03 | 2.2121: Increase amount of condensate returned | $942 | $1,016 | - |
$942
-
MMBtu
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,180 | $931 |
$2,130
29,015
kWh
|
- | $4,050 | |
| 05 | 2.3191: Use demand controller or load shedder | $1,974 | $2,113 |
$1,974
-
kWh
|
- | - | |
| TOTAL RECOMMENDED | $22,298 | $5,218 |
$4,104
29,015
kWh
|
$15,314
-
MMBtu
|
$2,880 | ||
| TOTAL IMPLEMENTED | $13,202 | $1,158 | - |
$14,372
-
MMBtu
|
$(-1,170.0) | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs