ITAC Assessment: MA0039
ITAC logo
ITAC Assessment: MA0039
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product SYNTHETIC YARN
NAICS
n/a
SIC 2282: Yarn Texturizing, Throwing, Twisting, and Winding Mills
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area
n/a
Annual Production 3,000,000
lb
Production Hrs. Annual 6,468
hrs
Location (State) Rhode Island

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $469,251 6,412,954
kWh
Fuel Oil #2 $33,440 5,674
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,298 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,202

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings Administrative Changes Savings
01 2.2113: Repair or replace steam traps $10,926 $455 - $12,096
-
MMBtu
$(-1,170.0)
02 2.2511: Insulate bare equipment $2,276 $703 - $2,276
-
MMBtu
-
03 2.2121: Increase amount of condensate returned $942 $1,016 - $942
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $6,180 $931 $2,130
29,015
kWh
- $4,050
05 2.3191: Use demand controller or load shedder $1,974 $2,113 $1,974
-
kWh
- -
TOTAL RECOMMENDED $22,298 $5,218 $4,104
29,015
kWh
$15,314
-
MMBtu
$2,880
TOTAL IMPLEMENTED $13,202 $1,158 - $14,372
-
MMBtu
$(-1,170.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs