ITAC Assessment: SF0111
ITAC logo
ITAC Assessment: SF0111
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Durable Labels, Overlays, and Touch Switches
NAICS
n/a
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 185
Plant Area 60,000
ft2
Annual Production 18,842
pieces
Production Hrs. Annual 4,160
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $107,838 1,303,927
kWh
Electricity Demand $27,934 6,304
kW-mo/yr
Natural Gas $11,749 1,930
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,587 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,381

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.4133: Use most efficient type of electric motors $390 $756 $325
3,810
kWh
$65
-
kW-mo/yr
- -
02 2.7144: Install spectral reflectors / delamp $6,291 $10,550 $5,270
63,892
kWh
$1,021
-
kW-mo/yr
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $527 $1,064 $448
5,569
kWh
$79
-
kW-mo/yr
- -
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,464 $1,860 $2,408
5,569
kWh
$744
-
kW-mo/yr
$(-688.0)
-
MMBtu
-
05 2.6218: Turn off equipment when not in use $1,150 $1,540 $1,044
12,603
kWh
$106
-
kW-mo/yr
- -
06 3.6193: Install equipment (eg compactor) to reduce disposal costs $2,765 $500 - - - $2,765
-
lb
TOTAL RECOMMENDED $13,587 $16,270 $9,495
91,443
kWh
$2,015
-
kW-mo/yr
$(-688.0)
-
MMBtu
$2,765
-
lb
TOTAL IMPLEMENTED $3,381 $3,680 $3,181
14,948
kWh
$888
-
kW-mo/yr
$(-688.0)
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs