ITAC Assessment: SF0106
ITAC logo
ITAC Assessment: SF0106
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Printed Polyethylene Film and Bags
NAICS
n/a
SIC 2673: Plastics, Foil, and Coated Paper Bags
Sales Range $10
M
to 50
M
# of Employees 95
Plant Area 43,000
ft2
Annual Production 11,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $248,099 5,297,480
kWh
Electricity Demand $88,610 6,919
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $43,372 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,247

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
01 2.4239: Eliminate or reduce compressed air usage $18,927 $31,800 $14,141
224,795
kWh
$4,786
-
kW-mo/yr
-
02 2.4133: Use most efficient type of electric motors $3,461 $1,110 $1,078
17,292
kWh
$2,383
-
kW-mo/yr
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $10,760 $1,377 $8,016
127,491
kWh
$2,744
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $5,526 $6,600 $3,790
60,375
kWh
$1,736
-
kW-mo/yr
-
05 2.1213: Direct warmest air to combustion intake $912 $2,750 $912
44,549
kWh
- -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $686 $481 $536
8,499
kWh
$150
-
kW-mo/yr
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $538 - $529
10,258
kWh
$9
-
kW-mo/yr
-
08 3.5212: Regrind, reuse, or sell scrap plastic parts $2,562 $200 - - $2,562
-
lb
TOTAL RECOMMENDED $43,372 $44,318 $29,002
493,259
kWh
$11,808
-
kW-mo/yr
$2,562
-
lb
TOTAL IMPLEMENTED $7,247 $1,791 $2,143
36,049
kWh
$2,542
-
kW-mo/yr
$2,562
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs