ITAC Assessment: SF0105
ITAC logo
ITAC Assessment: SF0105
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Plastic Check Valves, Pumps
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 16
Plant Area 10,500
ft2
Annual Production 7,300,000
pieces
Production Hrs. Annual 2,600
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $14,581 138,335
kWh
Electricity Demand $1,541 492
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,555 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,241

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $856 $3,000 $1,191
11,137
kWh
$162
-
kW-mo/yr
$(-497.0)
-
MMBtu
-
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $905 $1,082 $1,179
10,844
kWh
$68
-
kW-mo/yr
$(-342.0)
-
MMBtu
-
03 2.7135: Install occupancy sensors $532 $1,560 $475
4,396
kWh
$57
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,020 $5,900 $1,733
16,413
kWh
$287
-
kW-mo/yr
- -
05 2.6218: Turn off equipment when not in use $1,782 $1,960 $1,686
16,120
kWh
$96
-
kW-mo/yr
- -
06 2.6218: Turn off equipment when not in use $651 $600 $616
5,862
kWh
$35
-
kW-mo/yr
- -
07 3.5212: Regrind, reuse, or sell scrap plastic parts $809 $250 - - - $809
-
lb
TOTAL RECOMMENDED $7,555 $14,352 $6,880
64,772
kWh
$705
-
kW-mo/yr
$(-839.0)
-
MMBtu
$809
-
lb
TOTAL IMPLEMENTED $5,241 $10,832 $4,719
44,256
kWh
$552
-
kW-mo/yr
$(-839.0)
-
MMBtu
$809
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs