Assessment Year | 1996 |
---|---|
Principal Product | Injection Molding pieces |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 30 |
Plant Area |
20,000
ft2
|
Annual Production | 2,500,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $27,396 | 397,421 |
kWh
|
$0.069 |
Electricity Demand | $10,604 | 2,055 |
kW-mo/yr
|
$5.16 |
Natural Gas | $247 | 15 |
MMBtu
|
$16.47 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $4,287 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $607 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|
01 | 2.6218: Turn off equipment when not in use | $1,138 | - |
$942
13,482
kWh
|
$196
-
kW-mo/yr
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,562 | $5,950 |
$1,161
16,706
kWh
|
$401
-
kW-mo/yr
|
- | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $980 | $1,804 |
$980
14,068
kWh
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $261 | $50 |
$228
3,224
kWh
|
$33
-
kW-mo/yr
|
- | |
05 | 3.4154: Eliminate leaks in water lines and valves | $346 | $308 | - | - |
$346
-
Tgal
|
|
TOTAL RECOMMENDED | $4,287 | $8,112 |
$3,311
47,480
kWh
|
$630
-
kW-mo/yr
|
$346
-
Tgal
|
||
TOTAL IMPLEMENTED | $607 | $358 |
$228
3,224
kWh
|
$33
-
kW-mo/yr
|
$346
-
Tgal
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs