| Assessment Year | 1996 |
|---|---|
| Principal Product | Injection Molding pieces |
| NAICS |
n/a
|
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $5 M to 10M |
| # of Employees | 30 |
| Plant Area |
20,000
ft2
|
| Annual Production | 2,500,000
pieces
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $27,396 | 397,421 |
kWh
|
$0.069 |
| Electricity Demand | $10,604 | 2,055 |
kW-mo/yr
|
$5.16 |
| Natural Gas | $247 | 15 |
MMBtu
|
$16.47 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $4,287 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $607 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.6218: Turn off equipment when not in use | $1,138 | - |
$942
13,482
kWh
|
$196
-
kW-mo/yr
|
- | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,562 | $5,950 |
$1,161
16,706
kWh
|
$401
-
kW-mo/yr
|
- | |
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $980 | $1,804 |
$980
14,068
kWh
|
- | - | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $261 | $50 |
$228
3,224
kWh
|
$33
-
kW-mo/yr
|
- | |
| 05 | 3.4154: Eliminate leaks in water lines and valves | $346 | $308 | - | - |
$346
-
Tgal
|
|
| TOTAL RECOMMENDED | $4,287 | $8,112 |
$3,311
47,480
kWh
|
$630
-
kW-mo/yr
|
$346
-
Tgal
|
||
| TOTAL IMPLEMENTED | $607 | $358 |
$228
3,224
kWh
|
$33
-
kW-mo/yr
|
$346
-
Tgal
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs