ITAC Assessment: SF0092
ITAC logo
ITAC Assessment: SF0092
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Frozen Bakery Dough
NAICS
n/a
SIC 2053: Frozen Bakery Products, Except Bread
Sales Range $5
M
to 10
M
# of Employees 98
Plant Area 37,000
ft2
Annual Production 22,500,000
lb
Production Hrs. Annual 4,420
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $151,237 2,420,574
kWh
Electricity Demand $55,285 6,242
kW-mo/yr
Natural Gas $27,906 4,784
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $75,260 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $659

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.4133: Use most efficient type of electric motors $1,575 $1,150 $1,102
17,585
kWh
$473
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,181 $3,900 $731
11,723
kWh
$450
-
kW-mo/yr
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $572 $563 $354
5,569
kWh
$218
-
kW-mo/yr
- -
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $659 $962 $292
4,689
kWh
$478
-
kW-mo/yr
$(-111.0)
-
MMBtu
-
05 2.4134: Replace electric motor with fossil fuel engine $9,436 $129,300 $68,913
1,201,055
kWh
$1,994
-
kW-mo/yr
$(-61,471.0)
-
MMBtu
-
06 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $53,507 $524,531 $112,449
1,959,848
kWh
$4,622
-
kW-mo/yr
$(-63,564.0)
-
MMBtu
-
07 3.5313: Increase amount of waste recovered for resale $8,330 $500 - - - $8,330
-
lb
TOTAL RECOMMENDED $75,260 $660,906 $183,841
3,200,469
kWh
$8,235
-
kW-mo/yr
$(-125,146.0)
-
MMBtu
$8,330
-
lb
TOTAL IMPLEMENTED $659 $962 $292
4,689
kWh
$478
-
kW-mo/yr
$(-111.0)
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs