ITAC Assessment: OR0576
ITAC logo
ITAC Assessment: OR0576
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Shellfish Larvae
NAICS 112512: Shellfish Farming
SIC 0921: Fish Hatcheries and Preserves
Sales Range $500
k
to 1
M
# of Employees 6
Plant Area 20,000
ft2
Annual Production 6,000,000,000
units
Production Hrs. Annual 6,720
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $18,612 377,200
kWh
Electricity Demand $657 765
kW-mo/yr
LPG $23,822 991
MMBtu
Fuel Oil #2 $107,932 4,604
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $120,914 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,860

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Fuel Oil #2 Savings Administrative Changes Savings
01 2.1113: Reduce combustion air flow to optimum $10,860 $1,000 - - $1,290
-
MMBtu
$10,570
-
MMBtu
$(-1,000.0)
02 2.2444: Use hot process fluids to preheat incoming process fluids $109,290 $104,251 $(-7,400.0)
(-150,000)
kWh
$(-210.0)
-
kW-mo/yr
- $116,900
-
MMBtu
-
03 2.9114: Use solar heat to make electricty $764 $4,960 - - - $764
-
MMBtu
-
TOTAL RECOMMENDED $120,914 $110,211 $(-7,400.0)
(-150,000)
kWh
$(-210.0)
-
kW-mo/yr
$1,290
-
MMBtu
$128,234
-
MMBtu
$(-1,000.0)
TOTAL IMPLEMENTED $10,860 $1,000 - - $1,290
-
MMBtu
$10,570
-
MMBtu
$(-1,000.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs