Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Wooden Countertops
NAICS
n/a
SIC 2541: Wood Office and Store Fixtures, Partitions, Shelving, and Lockers
Sales Range $1
M
to 5
M
# of Employees 23
Plant Area 25,000
ft2
Annual Production 520
thousand feet
Production Hrs. Annual 2,600
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $31,176 311,254
kWh
Electricity Demand $5,732 1,368
kW-mo/yr
Natural Gas $2,257 278
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,115 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,414

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,684 $11,906 $3,684
36,635
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $913 $3,000 $765
7,620
kWh
$148
-
kW-mo/yr
-
03 2.4133: Use most efficient type of electric motors $221 $281 $183
1,758
kWh
$38
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $280 - $251
2,345
kWh
$29
-
kW-mo/yr
-
05 3.5313: Increase amount of waste recovered for resale $1,017 - - - $1,017
-
lb
TOTAL RECOMMENDED $6,115 $15,187 $4,883
48,358
kWh
$215
-
kW-mo/yr
$1,017
-
lb
TOTAL IMPLEMENTED $1,414 $3,281 $1,199
11,723
kWh
$215
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs