ITAC Assessment: SF0090
ITAC logo
ITAC Assessment: SF0090
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Metal Casting, Injection Molded Plastic Products
NAICS
n/a
SIC 3355: Aluminum Rolling and Drawing, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 75
Plant Area 40,000
ft2
Annual Production 45,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $55,250 619,285
kWh
Electricity Demand $9,828 2,292
kW-mo/yr
Natural Gas $62,533 9,277
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,267 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,267

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.4133: Use most efficient type of electric motors $348 $577 $272
2,931
kWh
$76
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,366 $13,620 $1,852
20,809
kWh
$514
-
kW-mo/yr
- -
03 2.2511: Insulate bare equipment $8,425 $3,900 - - $8,425
-
MMBtu
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $833 - $690
7,620
kWh
$143
-
kW-mo/yr
- -
05 2.4314: Use synthetic lubricant $434 $525 $340
3,810
kWh
$94
-
kW-mo/yr
- -
06 3.5313: Increase amount of waste recovered for resale $2,880 $500 - - - $2,880
-
lb
07 3.5313: Increase amount of waste recovered for resale $981 - - - - $981
-
lb
TOTAL RECOMMENDED $16,267 $19,122 $3,154
35,170
kWh
$827
-
kW-mo/yr
$8,425
-
MMBtu
$3,861
-
lb
TOTAL IMPLEMENTED $16,267 $19,122 $3,154
35,170
kWh
$827
-
kW-mo/yr
$8,425
-
MMBtu
$3,861
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs