| Assessment Year | 1996 |
|---|---|
| Principal Product | Envelopes |
| NAICS |
n/a
|
| SIC | 2677: Envelopes |
| Sales Range | $10 M to 50M |
| # of Employees | 117 |
| Plant Area |
85,000
ft2
|
| Annual Production | 750,000,000
pieces
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $289,279 | 3,484,760 |
kWh
|
$0.083 |
| Electricity Demand | $58,710 | 8,836 |
kW-mo/yr
|
$6.64 |
| Natural Gas | $9,422 | 1,408 |
MMBtu
|
$6.69 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $42,555 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $1,890 | $2,203 |
$1,522
18,464
kWh
|
$368
-
kW-mo/yr
|
- | - | |
| 02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $4,170 | $2,331 |
$3,360
40,445
kWh
|
$810
-
kW-mo/yr
|
- | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $13,025 | $28,020 |
$10,742
129,250
kWh
|
$2,283
-
kW-mo/yr
|
- | - | |
| 04 | 2.7135: Install occupancy sensors | $426 | $1,200 |
$302
3,517
kWh
|
$124
-
kW-mo/yr
|
- | - | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $856 | $1,382 |
$766
9,086
kWh
|
$90
-
kW-mo/yr
|
- | - | |
| 06 | 2.3132: Recharge batteries on during off-peak demand periods | $3,454 | $1,544 | - |
$3,454
-
kW-mo/yr
|
- | - | |
| 07 | 2.3212: Optimize plant power factor | $1,611 | $2,106 | - |
$1,611
-
kW-mo/yr
|
- | - | |
| 08 | 2.4239: Eliminate or reduce compressed air usage | $214 | $310 |
$164
2,052
kWh
|
$50
-
kW-mo/yr
|
- | - | |
| 09 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $348 | $1,726 |
$348
4,103
kWh
|
- | - | - | |
| 10 | 3.5314: Use in-process recycling whenever possible | $13,896 | - | - | - | - |
$13,896
-
lb
|
|
| 11 | 3.3122: Use filtration, centrifuging to remove contaminants | $2,665 | $10,550 | - | - |
$2,665
-
gal
|
- | |
| TOTAL RECOMMENDED | $42,555 | $51,372 |
$17,204
206,917
kWh
|
$8,790
-
kW-mo/yr
|
$2,665
-
gal
|
$13,896
-
lb
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs