Assessment Year | 1996 |
---|---|
Principal Product | Trailer Hitches |
NAICS |
n/a
|
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
148,000
ft2
|
Annual Production | 360,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $288,490 | 4,477,726 |
kWh
|
$0.064 |
Electricity Demand | $70,179 | 9,928 |
kW-mo/yr
|
$7.07 |
Natural Gas | $156,848 | 33,028 |
MMBtu
|
$4.75 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $45,577 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $19,940 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Solid Waste (haz) Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,999 | - |
$1,710
21,102
kWh
|
$289
-
kW-mo/yr
|
- | - | - | |
02 | 2.4133: Use most efficient type of electric motors | $2,178 | $2,914 |
$1,560
24,033
kWh
|
$618
-
kW-mo/yr
|
- | - | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,913 | $11,784 |
$2,913
45,135
kWh
|
- | - | - | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $11,287 | $39,123 |
$10,112
156,800
kWh
|
$1,175
-
kW-mo/yr
|
- | - | - | |
05 | 2.7135: Install occupancy sensors | $480 | $720 |
$294
4,689
kWh
|
$186
-
kW-mo/yr
|
- | - | - | |
06 | 2.3212: Optimize plant power factor | $3,582 | $7,036 | - |
$3,582
-
kW-mo/yr
|
- | - | - | |
07 | 2.3132: Recharge batteries on during off-peak demand periods | $2,378 | - | - |
$2,378
-
kW-mo/yr
|
- | - | - | |
08 | 3.7198: Reduce / eliminate use of disposable product | $2,065 | - | - | - | - | - |
$2,065
-
lb
|
|
09 | 3.3131: Use evaporation to concentrate material | $7,650 | $18,884 | - | - |
$7,650
-
gal
|
- | - | |
10 | 3.3125: Use distillation, evaporation to remove contaminants | $4,997 | $5,670 | - | - |
$4,997
-
gal
|
- | - | |
11 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $6,048 | $6,800 | - | - | - |
$6,048
-
lb
|
- | |
TOTAL RECOMMENDED | $45,577 | $92,931 |
$16,589
251,759
kWh
|
$8,228
-
kW-mo/yr
|
$12,647
-
gal
|
$6,048
-
lb
|
$2,065
-
lb
|
||
TOTAL IMPLEMENTED | $19,940 | $28,598 |
$3,270
45,135
kWh
|
$907
-
kW-mo/yr
|
$7,650
-
gal
|
$6,048
-
lb
|
$2,065
-
lb
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Solid Waste (haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs