ITAC Assessment: SF0079
ITAC logo
ITAC Assessment: SF0079
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Chocolate Candy
NAICS
n/a
SIC 2064: Candy and Other Confectionery Products
Sales Range $5
M
to 10
M
# of Employees 35
Plant Area 14,000
ft2
Annual Production 720,000
lb
Production Hrs. Annual 2,080
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $28,519 282,532
kWh
Electricity Demand $3,551 800
kW-mo/yr
Natural Gas $3,401 527
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,581 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,247

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,316 $10,806 $3,316
25,498
kWh
- - -
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $5,240 $9,533 $6,921
60,961
kWh
$(-1,681.0)
-
MMBtu
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $118 $40 $118
1,172
kWh
- - -
04 3.4111: Use closed cycle process to minimize waste water production $813 $911 $415
18,757
kWh
- $398
-
gal
-
05 3.6193: Install equipment (eg compactor) to reduce disposal costs $2,094 $6,395 - - - $2,094
-
lb
TOTAL RECOMMENDED $11,581 $27,685 $10,770
106,388
kWh
$(-1,681.0)
-
MMBtu
$398
-
gal
$2,094
-
lb
TOTAL IMPLEMENTED $4,247 $11,757 $3,849
45,427
kWh
- $398
-
gal
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs