ITAC Assessment: SF0078
ITAC logo
ITAC Assessment: SF0078
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Electrical Connectors
NAICS
n/a
SIC 3264: Porcelain Electrical Supplies
Sales Range $10
M
to 50
M
# of Employees 98
Plant Area 34,000
ft2
Annual Production 8,500
pieces
Production Hrs. Annual 4,680
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $56,030 628,957
kWh
Electricity Demand $9,463 2,321
kW-mo/yr
Natural Gas $2,161 254
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,393 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,686

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,395 $20,400 $5,544
62,134
kWh
$851
-
kW-mo/yr
-
02 2.7135: Install occupancy sensors $107 $120 $96
1,172
kWh
$11
-
kW-mo/yr
-
03 2.6242: Minimize operation of equipment maintained in standby condition $7,801 $2,500 $3,793
42,497
kWh
$4,008
-
kW-mo/yr
-
04 2.6218: Turn off equipment when not in use $1,067 $1,280 $1,056
11,723
kWh
$11
-
kW-mo/yr
-
05 2.4133: Use most efficient type of electric motors $345 $602 $297
3,224
kWh
$48
-
kW-mo/yr
-
06 2.4239: Eliminate or reduce compressed air usage $188 $155 $149
1,758
kWh
$39
-
kW-mo/yr
-
07 3.3128: Utilize other methods to remove contaminants $2,490 $694 - - $2,490
-
gal
TOTAL RECOMMENDED $18,393 $25,751 $10,935
122,508
kWh
$4,968
-
kW-mo/yr
$2,490
-
gal
TOTAL IMPLEMENTED $16,686 $23,594 $9,337
104,631
kWh
$4,859
-
kW-mo/yr
$2,490
-
gal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs