Assessment Year | 1996 |
---|---|
Principal Product | Electrical Connectors |
NAICS |
n/a
|
SIC | 3264: Porcelain Electrical Supplies |
Sales Range | $10 M to 50M |
# of Employees | 98 |
Plant Area |
34,000
ft2
|
Annual Production | 8,500
pieces
|
Production Hrs. Annual | 4,680
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $56,030 | 628,957 |
kWh
|
$0.089 |
Electricity Demand | $9,463 | 2,321 |
kW-mo/yr
|
$4.08 |
Natural Gas | $2,161 | 254 |
MMBtu
|
$8.51 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $18,393 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $16,686 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,395 | $20,400 |
$5,544
62,134
kWh
|
$851
-
kW-mo/yr
|
- | |
02 | 2.7135: Install occupancy sensors | $107 | $120 |
$96
1,172
kWh
|
$11
-
kW-mo/yr
|
- | |
03 | 2.6242: Minimize operation of equipment maintained in standby condition | $7,801 | $2,500 |
$3,793
42,497
kWh
|
$4,008
-
kW-mo/yr
|
- | |
04 | 2.6218: Turn off equipment when not in use | $1,067 | $1,280 |
$1,056
11,723
kWh
|
$11
-
kW-mo/yr
|
- | |
05 | 2.4133: Use most efficient type of electric motors | $345 | $602 |
$297
3,224
kWh
|
$48
-
kW-mo/yr
|
- | |
06 | 2.4239: Eliminate or reduce compressed air usage | $188 | $155 |
$149
1,758
kWh
|
$39
-
kW-mo/yr
|
- | |
07 | 3.3128: Utilize other methods to remove contaminants | $2,490 | $694 | - | - |
$2,490
-
gal
|
|
TOTAL RECOMMENDED | $18,393 | $25,751 |
$10,935
122,508
kWh
|
$4,968
-
kW-mo/yr
|
$2,490
-
gal
|
||
TOTAL IMPLEMENTED | $16,686 | $23,594 |
$9,337
104,631
kWh
|
$4,859
-
kW-mo/yr
|
$2,490
-
gal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs